Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Greeting cards and posters
NAICS
n/a
SIC 2771: Greeting Cards
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area 200,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 5,850
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $153,460 1,934,936
kWh
Electricity Demand $61,259 5,345
kW-mo/yr
Electricity Fees $7,412 -
Natural Gas $58,729 14,254
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,270 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,840

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 3.4114: Replace city water with recycled water via cooling tower $4,740 $15,000 $(-2,460.0)
(-36,928)
kWh
- - $7,200
-
Tgal
-
02 3.7137: Replace cloth rags with paper towels $3,400 - - - - - $3,400
03 2.6218: Turn off equipment when not in use $2,454 - $1,432
38,687
kWh
$1,022
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,022 $2,144 $613
16,706
kWh
$409
-
kW-mo/yr
- - -
05 2.3135: Schedule routine maintenance during non-operating periods $2,230 - - $2,230
-
kW-mo/yr
- - -
06 2.2511: Insulate bare equipment $1,122 $2,310 - - $1,122
-
MMBtu
- -
07 2.4221: Install compressor air intakes in coolest locations $318 $1,380 $159
7,913
kWh
$159
-
kW-mo/yr
- - -
08 2.7447: Install vinyl strip / high speed / air curtain doors $440 $500 - - $440
-
MMBtu
- -
09 2.6121: Reduce hot water temperature to the minimum required $404 - - - $404
-
MMBtu
- -
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $140 - $68
1,758
kWh
$72
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $16,270 $21,334 $(-188.0)
28,136
kWh
$3,892
-
kW-mo/yr
$1,966
-
MMBtu
$7,200
-
Tgal
$3,400
TOTAL IMPLEMENTED $3,840 $500 - - $440
-
MMBtu
- $3,400
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings