ITAC Assessment: UD0560
ITAC logo
ITAC Assessment: UD0560
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Printed folding chipboard/corrugated cartons
NAICS
n/a
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area 112,000
ft2
Annual Production 5,400
ton
Production Hrs. Annual 4,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,988 1,001,759
kWh
Electricity Demand $52,320 3,708
kW-mo/yr
Natural Gas $19,546 4,016
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $943,634 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,409

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Increase in Production Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $880,000 $2,100,000 - - - - $280,000 $600,000
02 3.5217: Reuse / recycle/ sell paper products $31,250 - - - - $31,250
-
lb
- -
03 4.632: Change operating conditions $15,400 $20,000 - - - - $15,400 -
04 2.4226: Use / purchase optimum sized compressor $5,825 $860 $2,566
98,769
kWh
$3,259
-
kW-mo/yr
- - - -
05 3.5316: Contract a wood pallet recycling company $4,300 - - - - $4,300
-
lb
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,148 $4,420 $639
24,619
kWh
$1,509
-
kW-mo/yr
- - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,789 $330 $682
26,377
kWh
$1,107
-
kW-mo/yr
- - - -
08 2.3132: Recharge batteries on during off-peak demand periods $1,081 - - $1,081
-
kW-mo/yr
- - - -
09 2.2437: Recover waste heat from equipment $784 $1,060 - - $784
-
MMBtu
- - -
10 2.4221: Install compressor air intakes in coolest locations $563 $380 $215
8,206
kWh
$348
-
kW-mo/yr
- - - -
11 2.4111: Utilize energy-efficient belts and other improved mechanisms $494 - $156
5,862
kWh
$338
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $943,634 $2,127,050 $4,258
163,833
kWh
$7,642
-
kW-mo/yr
$784
-
MMBtu
$35,550
-
lb
$295,400 $600,000
TOTAL IMPLEMENTED $42,409 $6,190 $1,692
65,064
kWh
$4,383
-
kW-mo/yr
$784
-
MMBtu
$35,550
-
lb
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs