ITAC Assessment: WM0109
ITAC logo
ITAC Assessment: WM0109
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Treat Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 5
Plant Area 273,000
ft2
Annual Production 80,001
units
Production Hrs. Annual 8,760
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,095 1,854,454
kWh
Electricity Demand $44,887 4,240
kW-mo/yr
Electricity Fees $25,958 -
Natural Gas $16,710 3,153
MMBtu
Waste Disposal Costs
Water Usage $1,931 94
Tgal
Solid Waste (haz) $150,000 1,414,000
lb
TOTAL YEARLY COSTS $333,581
RECOMMENDED SAVINGS* $334,604 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,914

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (haz) Savings One-time Revenue or Avoided Cost Savings By-product Production Savings
01 3.5311: Recover and reuse waste material $282,127 $836,828 - - - $150,000
-
lb
- $132,127
02 2.9114: Use solar heat to make electricty $27,888 $228,151 $27,888
452,000
kWh
- - - - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,544 $42,400 $11,315
223,001
kWh
$3,229
-
kW-mo/yr
- - - -
04 2.7231: Use radiant heater for spot heating $3,705 $6,960 - - $3,705
-
MMBtu
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,624 $1,590 $874
17,231
kWh
$750
-
kW-mo/yr
- - - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,520 - $967
19,060
kWh
$553
-
kW-mo/yr
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,182 $1,400 $1,182
21,362
kWh
- - - - -
08 2.4221: Install compressor air intakes in coolest locations $817 $1,224 $635
12,520
kWh
$182
-
kW-mo/yr
- - - -
09 2.7224: Reduce space conditioning during non-working hours $803 - $72
1,413
kWh
- $731
-
MMBtu
- - -
10 3.4116: Meter recycled water (to reduce sewer charges) $394 - - - - - $394 -
TOTAL RECOMMENDED $334,604 $1,118,553 $42,933
746,587
kWh
$4,713
-
kW-mo/yr
$4,436
-
MMBtu
$150,000
-
lb
$394 $132,127
TOTAL IMPLEMENTED $1,914 - $967
19,060
kWh
$553
-
kW-mo/yr
- - $394 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (haz) Savings One-time Revenue or Avoided Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs