ITAC Assessment: UU0104
ITAC logo
ITAC Assessment: UU0104
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product bridges
NAICS 333924: Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing
SIC 3537: Industrial Trucks, Tractors, Trailers, and Stackers
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 350,000
ft2
Annual Production 200
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,927 4,161,600
kWh
Electricity Demand $109,415 13,139
kW-mo/yr
Natural Gas $360,176 39,969
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $358,770 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.3191: Use demand controller or load shedder $19,040 $10,000 - $19,040
-
kW-mo/yr
- - -
02 2.4224: Upgrade controls on compressors $2,420 $2,000 $790
32,215
kWh
- - - $1,630
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,540 $3,530 $10,110
411,510
kWh
$5,430
-
kW-mo/yr
- - -
04 2.2314: Replace heat treating oven with more efficient unit $104,490 $16,800 - - - $104,490
-
MMBtu
-
05 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $198,120 $1,974,210 $125,000
4,161,600
kWh
$125,000
-
kW-mo/yr
$6,586 $(-58,466.0)
-
MMBtu
-
06 2.2414: Use waste heat from hot flue gases to preheat $15,650 $28,400 $(-620.0)
(-25,380)
kWh
$(-530.0)
-
kW-mo/yr
- $16,800
-
MMBtu
-
07 2.3212: Optimize plant power factor $3,510 $8,490 - $3,510
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $358,770 $2,043,430 $135,280
4,579,945
kWh
$152,450
-
kW-mo/yr
$6,586 $62,824
-
MMBtu
$1,630
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs