ITAC Assessment: IC0231
ITAC logo
ITAC Assessment: IC0231
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Bottled Water Manufacturing
NAICS 312112: Bottled Water Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 200,000
ft2
Annual Production 205,000,000
units
Production Hrs. Annual 8,736
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $473,357 6,762,240
kWh
Electricity Demand $191,969 15,053
kW-mo/yr
Electricity Fees $54,493 -
Natural Gas $2,242 294
MMBtu
TOTAL YEARLY COSTS $722,061
RECOMMENDED SAVINGS* $59,013 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,952

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.3212: Optimize plant power factor $15,040 $26,145 - $15,040
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $21,285 $6,673 $16,619
237,409
kWh
$4,667
-
kW-mo/yr
03 2.4226: Use / purchase optimum sized compressor $5,211 $50,440 $3,500
50,000
kWh
$1,711
-
kW-mo/yr
04 2.4221: Install compressor air intakes in coolest locations $12,061 $2,400 $12,061
172,298
kWh
-
05 2.3132: Recharge batteries on during off-peak demand periods $5,416 - - $5,416
-
kW-mo/yr
TOTAL RECOMMENDED $59,013 $85,658 $32,179
459,707
kWh
$26,833
-
kW-mo/yr
TOTAL IMPLEMENTED $46,952 $83,258 $20,119
287,409
kWh
$26,833
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs