Assessment Year | 2000 |
---|---|
Principal Product | Flat Circuits and Flex board |
NAICS |
n/a
|
SIC | 3678: Electronic Connectors |
Sales Range | $100 M to 500M |
# of Employees | 300 |
Plant Area |
150,000
ft2
|
Annual Production | 100,000
pieces
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $772,676 | 16,445,194 |
kWh
|
$0.047 |
Electricity Fees | $140,854 | - |
|
- |
Natural Gas | $132,086 | 23,111 |
MMBtu
|
$5.72 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $37,507 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,045 | $382 |
$3,645
115,182
kWh
|
$400
-
kW-mo/yr
|
- | - | - | - | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,469 | $3,800 |
$5,814
183,763
kWh
|
$655
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.4133: Use most efficient type of electric motors | $4,073 | $6,959 |
$3,711
104,338
kWh
|
$362
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $407 | $609 |
$217
6,741
kWh
|
$17
-
kW-mo/yr
|
- | - | $86 | - | $87 | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $10,262 | $120 |
$10,262
324,736
kWh
|
- | - | - | - | - | - | |
06 | 3.6192: Use a less expensive method of waste removal | $1,244 | $120 | - | - | - | - | - | $1,244 | - | |
07 | 3.5316: Contract a wood pallet recycling company | $576 | $60 | - | - | - |
$576
-
lb
|
- | - | - | |
08 | 3.5313: Increase amount of waste recovered for resale | $4,509 | $780 | - | - |
$5,836
-
gal
|
- | $(-1,327.0) | - | - | |
09 | 4.446: Automate finishing process | $5,355 | $1,500 | - | - | - | - | $5,355 | - | - | |
10 | 4.454: Modify startup/shutdown times | $567 | $120 | - | - | - | - | - | $567 | - | |
TOTAL RECOMMENDED | $37,507 | $14,450 |
$23,649
734,760
kWh
|
$1,434
-
kW-mo/yr
|
$5,836
-
gal
|
$576
-
lb
|
$4,114 | $1,811 | $87 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs