21
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| DL0223 #06 Y:2023 | 06 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $1,906 | $7,955 | |
| DL0223 #05 Y:2023 | 05 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $490,980 | $10,000 | |
| DL0223 #04 Y:2023 | 04 | 2023 | Install adequate dryers on air lines to eliminate blowdown | $994 | $4,800 | |
| DL0223 #03 Y:2023 | 03 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $9,840 | $2,800 | |
| DL0223 #02 Y:2023 | 02 | 2023 | Utilize controls to operate equipment only when needed | $1,437 | $1,030 | |
| DL0223 #01 Y:2023 | 01 | 2023 | Eliminate/reduce an operation | $9,025 | - | |
| DL0219 #09 Y:2023 | 09 | 2023 | Replace city water with recycled water via cooling tower | $51,679 | $50,000 | |
| DL0219 #08 Y:2023 | 08 | 2023 | Utilize higher efficiency lamps and/or ballasts | $4,178 | $10,128 | |
| DL0219 #07 Y:2023 | 07 | 2023 | Use cooling air which cools hot work pieces for space heating | $2,856 | $16,145 | |
| DL0219 #06 Y:2023 | 06 | 2023 | Replace heat treating oven with more efficient unit | $11,196 | $50,000 | |
| DL0219 #05 Y:2023 | 05 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $6,974 | $10,600 | |
| DL0219 #04 Y:2023 | 04 | 2023 | Minimize operation of equipment maintained in standby condition | $5,827 | - | |
| DL0219 #03 Y:2023 | 03 | 2023 | Minimize operation of equipment maintained in standby condition | $6,246 | $4,000 | |
| DL0219 #02 Y:2023 | 02 | 2023 | Close holes and openings in building such as broken windows | $922 | $520 | |
| DL0219 #01 Y:2023 | 01 | 2023 | Air condition only space necessary | $496 | - | |
| DL0024 #06 Y:2008 | 06 | 2008 | Use adjustable frequency drive or multiple speed motors on existing system | $37,200 | $112,000 | |
| DL0024 #05 Y:2008 | 05 | 2008 | Repair and eliminate steam leaks | $10,800 | $1,200 | |
| DL0024 #04 Y:2008 | 04 | 2008 | Utilize energy-efficient belts and other improved mechanisms | $12,421 | $3,877 | |
| DL0024 #03 Y:2008 | 03 | 2008 | Eliminate leaks in inert gas and compressed air lines/ valves | $21,865 | $11,000 | |
| DL0024 #02 Y:2008 | 02 | 2008 | Replace boiler | $116,210 | $102,000 |