ITAC Assessment: DL0219
ITAC logo
ITAC Assessment: DL0219
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Carbonated beverages
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $50
M
to 100
M
# of Employees 90
Plant Area 100,000
ft2
Annual Production 30,607
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $241,977 4,646,411
kWh
Electricity Demand $36,061 9,590
kW-mo/yr
Electricity Fees $4,457 -
Natural Gas $79,726 17,664
MMBtu
Waste Disposal Costs
Water Usage $1,317,555 76,115
Tgal
TOTAL YEARLY COSTS $1,679,776
RECOMMENDED SAVINGS* $90,374 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,671

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
01 2.7229: Air condition only space necessary $496 - $430
8,271
kWh
$66
-
kW-mo/yr
- -
02 2.7444: Close holes and openings in building such as broken windows $922 $520 - - $922
-
MMBtu
-
03 2.6242: Minimize operation of equipment maintained in standby condition $6,246 $4,000 $238
4,578
kWh
$37
-
kW-mo/yr
$5,971
-
MMBtu
-
04 2.6242: Minimize operation of equipment maintained in standby condition $5,827 - $5,827
97,119
kWh
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,974 $10,600 $6,044
116,237
kWh
$930
-
kW-mo/yr
- -
06 2.2314: Replace heat treating oven with more efficient unit $11,196 $50,000 - - $11,196
-
MMBtu
-
07 2.2491: Use cooling air which cools hot work pieces for space heating $2,856 $16,145 - - $2,856
-
MMBtu
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $4,178 $10,128 $3,621
69,642
kWh
$557
-
kW-mo/yr
- -
09 3.4114: Replace city water with recycled water via cooling tower $51,679 $50,000 - - - $51,679
-
Tgal
TOTAL RECOMMENDED $90,374 $141,393 $16,160
295,847
kWh
$1,590
-
kW-mo/yr
$20,945
-
MMBtu
$51,679
-
Tgal
TOTAL IMPLEMENTED $28,671 $70,728 $15,922
291,269
kWh
$1,553
-
kW-mo/yr
$11,196
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs