ITAC Assessment: DL0223
ITAC logo
ITAC Assessment: DL0223
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Carbonated beverages
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $50
M
to 100
M
# of Employees 90
Plant Area 100,000
ft2
Annual Production 30,607
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $241,977 4,646,411
kWh
Electricity Demand $36,061 9,590
kW-mo/yr
Electricity Fees $4,457 -
Natural Gas $79,726 17,644
MMBtu
Waste Disposal Costs
Water Usage $1,317,555 76,115
Tgal
Gaseous Waste $3,083,341 38,541,770
lb
TOTAL YEARLY COSTS $4,763,117
RECOMMENDED SAVINGS* $514,182 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,456

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Gaseous Waste Savings
01 3.1161: Eliminate/reduce an operation $9,025 - $7,821
150,400
kWh
$1,204
-
kW-mo/yr
-
02 2.6231: Utilize controls to operate equipment only when needed $1,437 $1,030 $1,246
23,955
kWh
$191
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,840 $2,800 $8,528
163,992
kWh
$1,312
-
kW-mo/yr
-
04 2.4222: Install adequate dryers on air lines to eliminate blowdown $994 $4,800 $862
16,568
kWh
$132
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $490,980 $10,000 - - $490,980
-
lb
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,906 $7,955 $1,650
31,773
kWh
$256
-
kW-mo/yr
-
TOTAL RECOMMENDED $514,182 $26,585 $20,107
386,688
kWh
$3,095
-
kW-mo/yr
$490,980
-
lb
TOTAL IMPLEMENTED $11,456 $5,830 $9,929
190,923
kWh
$1,527
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Gaseous Waste Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs