Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50

matching recommendations
$
$
ARC 2+ Digits Required
NAICS All other miscellaneous food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0555 #07 Y:2020 Replace boiler $14,667 $114,810
SF0555 #06 Y:2020 Use adjustable frequency drive or multiple speed motors on existing system $7,764 $20,616
SF0555 #05 Y:2020 Utilize higher efficiency lamps and/or ballasts $26,221 $33,106
SF0555 #04 Y:2020 Replace fossil fuel equipment with electrical equipment $450,171 $750,000
SF0555 #03 Y:2020 Install vinyl strip / high speed / air curtain doors $3,734 $3,930
SF0555 #02 Y:2020 Insulate bare equipment $1,257 $1,080
SF0555 #01 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $5,084 -
SD0491 #06 Y:2014 Reduce the pressure of compressed air to the minimum required $310 $200
SD0491 #05 Y:2014 Use photocell controls $445 $555
SD0491 #04 Y:2014 Install occupancy sensors $609 $957
SD0491 #03 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $924 $3,450
SD0491 #02 Y:2014 Use computer programs to optimize hvac performance $1,726 $194
SD0491 #01 Y:2014 Replace existing hvac unit with high efficiency model $4,862 $5,500
SF0443 #11 Y:2013 Use solar heat to make electricty $67,869 $444,663
SF0443 #10 Y:2013 Minimize contamination of water before treatment $11,793 $50,140
SF0443 #09 Y:2013 Install equipment (eg compactor) to reduce disposal costs $63,378 $31,000
SF0443 #08 Y:2013 Insulate bare equipment $9,060 $45,537
SF0443 #07 Y:2013 Utilize higher efficiency lamps and/or ballasts $4,886 $16,744
SF0443 #06 Y:2013 Utilize higher efficiency lamps and/or ballasts $13,897 $24,840
SF0443 #05 Y:2013 Replace hydraulic / pneumatic equipment with electric equipment $57,826 $69,335