ITAC Assessment: SF0555
ITAC logo
ITAC Assessment: SF0555
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Specialty Food Products
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 24,498
ft2
Annual Production 200,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $197,315 1,122,123
kWh
Electricity Demand $119,796 2,972
kW-mo/yr
Electricity Fees $(-87,971.0) -
Natural Gas $90,417 8,946
MMBtu
TOTAL YEARLY COSTS $319,557
RECOMMENDED SAVINGS* $572,005 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $58,727

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,084 - $6,344
33,604
kWh
- $(-1,260.0)
02 2.2511: Insulate bare equipment $1,257 $1,080 - $1,257
-
MMBtu
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $3,734 $3,930 $3,734
19,778
kWh
- -
04 2.1321: Replace fossil fuel equipment with electrical equipment $450,171 $750,000 $450,171
249,600
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $26,221 $33,106 $26,221
133,672
kWh
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,764 $20,616 $7,764
41,121
kWh
- -
07 2.1224: Replace boiler $14,667 $114,810 $1,524
8,071
kWh
$13,143
-
MMBtu
-
08 2.9114: Use solar heat to make electricty $63,107 $268,469 $63,107
334,254
kWh
- -
TOTAL RECOMMENDED $572,005 $1,192,011 $558,865
820,100
kWh
$14,400
-
MMBtu
$(-1,260.0)
TOTAL IMPLEMENTED $58,727 $173,542 $45,587
236,246
kWh
$14,400
-
MMBtu
$(-1,260.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings