ITAC Assessment: LT0054
ITAC logo
ITAC Assessment: LT0054
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product COMMERCIAL CARPET
NAICS
n/a
SIC 2273: Carpets and Rugs
Sales Range $10
M
to 50
M
# of Employees 650
Plant Area
n/a
Annual Production 6,750
thousand feet
Production Hrs. Annual 6,600
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $665,355 13,034,877
kWh
Natural Gas $910,776 246,882
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $129,728 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,625

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $21,600 $20,000 $21,600
-
MMBtu
02 2.2444: Use hot process fluids to preheat incoming process fluids $20,100 $27,000 $20,100
-
MMBtu
03 2.2437: Recover waste heat from equipment $923 $700 $923
-
MMBtu
04 2.2444: Use hot process fluids to preheat incoming process fluids $32,000 $45,000 $32,000
-
MMBtu
05 2.2511: Insulate bare equipment $4,980 $8,240 $4,980
-
MMBtu
06 2.2135: Repair and eliminate steam leaks $598 $263 $598
-
MMBtu
07 2.2136: Install / repair insulation on steam lines $427 $424 $427
-
MMBtu
08 2.4323: Use optimum size and capacity equipment $49,100 $50,000 $49,100
-
MMBtu
TOTAL RECOMMENDED $129,728 $151,627 $129,728
-
MMBtu
TOTAL IMPLEMENTED $22,625 $20,687 $22,625
-
MMBtu
Yearly Savings* Imp'd Cost* Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs