ITAC Assessment: SD0491
ITAC logo
ITAC Assessment: SD0491
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Mexican Rice Pudding
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2032: Canned Specialties
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area 14,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,191 548,994
kWh
Electricity Demand $33,885 1,703
kW-mo/yr
Electricity Fees $2,221 -
Natural Gas $20,318 2,798
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,876 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $310

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7232: Replace existing hvac unit with high efficiency model $4,862 $5,500 $4,142
52,635
kWh
$720
-
kW-mo/yr
02 2.7226: Use computer programs to optimize hvac performance $1,726 $194 $1,726
21,928
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $924 $3,450 $548
6,962
kWh
$376
-
kW-mo/yr
04 2.7135: Install occupancy sensors $609 $957 $609
7,748
kWh
-
05 2.7134: Use photocell controls $445 $555 $331
4,200
kWh
$114
-
kW-mo/yr
06 2.4231: Reduce the pressure of compressed air to the minimum required $310 $200 $310
3,933
kWh
-
TOTAL RECOMMENDED $8,876 $10,856 $7,666
97,406
kWh
$1,210
-
kW-mo/yr
TOTAL IMPLEMENTED $310 $200 $310
3,933
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs