Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

130

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Spice and extract manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0274 #07 Y:2023 Utilize energy-efficient belts and other improved mechanisms $1,122 $501
UA0274 #06 Y:2023 Install replacement doors $650 $1,640
UA0274 #05 Y:2023 Replace existing hvac unit with high efficiency model $7,420 $26,542
UA0274 #04 Y:2023 Install timers and/or thermostats $8,176 $890
UA0274 #03 Y:2023 Use proper thickness of insulation on building envelope $15,300 $72,265
UA0274 #02 Y:2023 Reduce the pressure of compressed air to the minimum required $11,102 $1,000
UA0274 #01 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $19,205 $8,523
MI0371 #07 Y:2019 Utilize energy-efficient belts and other improved mechanisms $210 $407
MI0371 #06 Y:2019 Install occupancy sensors $473 $325
MI0371 #05 Y:2019 Install soft-start to eliminate nuisance trips $1,638 $2,460
MI0371 #04 Y:2019 Reduce illumination to minimum necessary levels $2,708 $1,275
MI0371 #03 Y:2019 Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $4,458 $5,640
MI0371 #02 Y:2019 Install vinyl strip / high speed / air curtain doors $8,462 $820
MI0371 #01 Y:2019 Clean or color roof to reduce solar load $9,343 $7,557
NC0586 #07 Y:2016 Develop a repair/replace policy $2,834 $4,685
NC0586 #06 Y:2016 Utilize higher efficiency lamps and/or ballasts $1,008 $2,890
NC0586 #05 Y:2016 Utilize higher efficiency lamps and/or ballasts $929,030 $400,000
NC0586 #04 Y:2016 Utilize higher efficiency lamps and/or ballasts $9,873 $9,000
NC0586 #03 Y:2016 Eliminate or reduce compressed air usage $988 $2,500
NC0586 #02 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $308 $200