ITAC Assessment: UA0274
ITAC logo
ITAC Assessment: UA0274
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Beverage
NAICS 311942: Spice and Extract Manufacturing
SIC 2082: Malt Beverages
Sales Range $50
M
to 100
M
# of Employees 213
Plant Area 97,333
ft2
Annual Production 26,500,000
units
Production Hrs. Annual 8,736
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $693,143 9,748,800
kWh
Electricity Demand $268,868 18,441
kW-mo/yr
Electricity Fees $(-168,136.0) -
Natural Gas $347,775 27,914
MMBtu
TOTAL YEARLY COSTS $1,141,650
RECOMMENDED SAVINGS* $62,975 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,307

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $19,205 $8,523 $22,690
319,122
kWh
$612
-
kW-mo/yr
$(-4,097.0) -
02 2.4231: Reduce the pressure of compressed air to the minimum required $11,102 $1,000 $12,537
176,329
kWh
$933
-
kW-mo/yr
$(-2,368.0) -
03 2.7492: Use proper thickness of insulation on building envelope $15,300 $72,265 $18,564
261,097
kWh
- $(-3,264.0) -
04 2.7261: Install timers and/or thermostats $8,176 $890 $1,484
20,873
kWh
- $(-261.0) $6,953
-
MMBtu
05 2.7232: Replace existing hvac unit with high efficiency model $7,420 $26,542 $6,466
90,946
kWh
$2,537
-
kW-mo/yr
$(-1,583.0) -
06 2.7495: Install replacement doors $650 $1,640 $789
11,095
kWh
- $(-139.0) -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,122 $501 $1,011
14,222
kWh
$350
-
kW-mo/yr
$(-239.0) -
TOTAL RECOMMENDED $62,975 $111,361 $63,541
893,684
kWh
$4,432
-
kW-mo/yr
$(-11,951.0) $6,953
-
MMBtu
TOTAL IMPLEMENTED $30,307 $9,523 $35,227
495,451
kWh
$1,545
-
kW-mo/yr
$(-6,465.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs