Assessment Year | 2023 |
---|---|
Principal Product | Magnetic Compressors |
NAICS | 333999: All Other Miscellaneous General Purpose Machinery Manufacturing |
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
119,700
ft2
|
Annual Production | 8,505
units
|
Production Hrs. Annual | 7,665
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $386,785 | 6,529,724 |
kWh
|
$0.059 | |
Electricity Demand | $463,321 | 31,852 |
kW-mo/yr
|
$14.55 | |
Electricity Fees | $276,495 | - |
|
- | |
Waste Disposal Costs | |||||
Water Usage | $9,106 | 3,020 |
Tgal
|
$3.01 | |
Water Disposal | $66,195 | 2,236 |
Tgal
|
$29.61 | |
TOTAL YEARLY COSTS | $1,201,902 | ||||
RECOMMENDED SAVINGS* | $241,185 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $156,329 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $91,215 | $297,040 |
$35,358
599,284
kWh
|
$55,857
-
kW-mo/yr
|
- | - | |
02 | 2.3191: Use demand controller or load shedder | $84,856 | $35,131 |
$38,525
652,972
kWh
|
$46,331
-
kW-mo/yr
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $22,121 | $756 |
$22,121
374,937
kWh
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,751 | $17,178 |
$11,434
193,797
kWh
|
$6,317
-
kW-mo/yr
|
- | - | |
05 | 2.7243: Improve air circulation with destratification fans / other methods | $14,162 | $12,350 |
$(-1,605.0)
(-27,200)
kWh
|
$(-613.0)
-
kW-mo/yr
|
$16,380 | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,352 | - |
$1,253
21,243
kWh
|
- | $38 | $61 | |
07 | 4.424: Improve space comfort conditioning | $9,728 | $4,480 |
$(-4,814.0)
(-81,586)
kWh
|
$(-1,838.0)
-
kW-mo/yr
|
$16,380 | - | |
TOTAL RECOMMENDED | $241,185 | $366,935 |
$102,272
1,733,447
kWh
|
$106,054
-
kW-mo/yr
|
$32,798 | $61 | ||
TOTAL IMPLEMENTED | $156,329 | $331,804 |
$63,747
1,080,475
kWh
|
$59,723
-
kW-mo/yr
|
$32,798 | $61 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs