Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Aluminum Pistons
NAICS
n/a
SIC 3592: Carburetors, Pistons, Piston Rings, and Valves
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 116,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $177,658 3,979,484
kWh
Electricity Demand $63,586 8,132
kW-mo/yr
Electricity Fees $12,856 -
Natural Gas $59,446 48,502
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,436 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,674

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
01 2.4133: Use most efficient type of electric motors $1,776 $302 $1,363
30,481
kWh
$413
-
kW-mo/yr
- - -
02 2.4221: Install compressor air intakes in coolest locations $2,192 $310 $2,192
49,238
kWh
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,194 $300 $1,194
29,601
kWh
- - - -
04 2.7243: Improve air circulation with destratification fans / other methods $857 $1,625 - - - $857
-
MMBtu
-
05 2.7111: Reduce illumination to minimum necessary levels $706 $25 $668
22,567
kWh
$38
-
kW-mo/yr
- - -
06 2.3212: Optimize plant power factor $2,604 $9,740 - - $2,604 - -
07 2.2449: Recover heat from exhausted steam, hot air or hot water $598 $1,400 - - - $598
-
MMBtu
-
08 2.2511: Insulate bare equipment $3,287 $878 - - - $3,287
-
MMBtu
-
09 2.7261: Install timers and/or thermostats $3,417 $1,504 - - - $3,417
-
MMBtu
-
10 2.7291: Reschedule and rearrange multiple-source heating systems $205 $340 - - - $205
-
MMBtu
-
11 2.2447: Heat water with exhaust heat $9,600 $1,000 - - - - $9,600
-
Tgal
TOTAL RECOMMENDED $26,436 $17,424 $5,417
131,887
kWh
$451
-
kW-mo/yr
$2,604 $8,364
-
MMBtu
$9,600
-
Tgal
TOTAL IMPLEMENTED $9,674 $2,984 $2,557
60,082
kWh
$413
-
kW-mo/yr
- $6,704
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs