ITAC Assessment: UM0089
ITAC logo
ITAC Assessment: UM0089
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Sheet metal stamping dies
NAICS
n/a
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $5
M
to 10
M
# of Employees 53
Plant Area 35,000
ft2
Annual Production 50
pieces
Production Hrs. Annual 6,006
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,030 1,077,081
kWh
Electricity Fees $1,659 -
Natural Gas $8,485 2,117
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,089 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Liquid (haz) Savings Primary Product Savings
01 2.4133: Use most efficient type of electric motors $881 $1,000 $881
8,792
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $12,465 $25,326 $12,465
124,560
kWh
- -
03 2.7135: Install occupancy sensors $1,588 $1,000 $1,588
15,826
kWh
- -
04 3.5248: Separate and recycle scrap metal to foundry or for sale $224 - - $224
-
gal
-
05 2.7224: Reduce space conditioning during non-working hours $12,931 $6,343 - - $12,931
TOTAL RECOMMENDED $28,089 $33,669 $14,934
149,178
kWh
$224
-
gal
$12,931
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs