ITAC Assessment: DL0026
ITAC logo
ITAC Assessment: DL0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Protective masks, enclosures, space suits and aerostats
NAICS 336411: Aircraft Manufacturing
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 274,031
ft2
Annual Production 245,025
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $508,175 4,263,301
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $110,115 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $83,877

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.6218: Turn off equipment when not in use $38,000 - $38,000
330,000
kWh
02 2.7221: Lower temperature during the winter season and vice-versa $15,500 - $15,500
133,620
kWh
03 2.2437: Recover waste heat from equipment $11,841 $1,430 $11,841
96,972
kWh
04 2.7314: Reduce ventilation air $9,470 - $9,470
81,600
kWh
05 2.4221: Install compressor air intakes in coolest locations $3,327 $640 $3,327
28,681
kWh
06 2.4226: Use / purchase optimum sized compressor $1,600 $2,800 $1,600
14,000
kWh
07 2.7232: Replace existing hvac unit with high efficiency model $23,000 $40,000 $23,000
269,000
kWh
08 2.7142: Utilize higher efficiency lamps and/or ballasts $7,377 $45,000 $7,377
63,591
kWh
TOTAL RECOMMENDED $110,115 $89,870 $110,115
1,017,464
kWh
TOTAL IMPLEMENTED $83,877 $85,000 $83,877
796,211
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs