Assessment Year | 2020 |
---|---|
Principal Product | Condiments |
NAICS | 311942: Spice and Extract Manufacturing |
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 37 |
Plant Area |
25,879
ft2
|
Annual Production | 2,458,204
pieces
|
Production Hrs. Annual | 4,550
hrs
|
Location (State) | Puerto Rico |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $156,764 | 832,920 |
kWh
|
$0.19 |
Electricity Demand | $18,495 | 2,376 |
kW-mo/yr
|
$7.78 |
Electricity Fees | $5,400 | - |
|
- |
TOTAL YEARLY COSTS | $180,659 | |||
RECOMMENDED SAVINGS* | $27,292 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $27,292 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7425: Clean or color roof to reduce solar load | $9,343 | $7,557 |
$8,424
44,809
kWh
|
$919
-
kW-mo/yr
|
|
02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $8,462 | $820 |
$8,462
45,012
kWh
|
- | |
03 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $4,458 | $5,640 |
$4,458
23,711
kWh
|
- | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $2,708 | $1,275 |
$2,443
12,995
kWh
|
$265
-
kW-mo/yr
|
|
05 | 2.4112: Install soft-start to eliminate nuisance trips | $1,638 | $2,460 |
$1,202
6,391
kWh
|
$436
-
kW-mo/yr
|
|
06 | 2.7135: Install occupancy sensors | $473 | $325 |
$473
2,514
kWh
|
- | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $210 | $407 |
$187
993
kWh
|
$23
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $27,292 | $18,484 |
$25,649
136,425
kWh
|
$1,643
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $27,292 | $18,484 |
$25,649
136,425
kWh
|
$1,643
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs