342
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MA0712 #03 Y:2013 | 03 | 2013 | Reduce the pressure of compressed air to the minimum required | $7,311 | $5,000 | |
| MA0712 #02 Y:2013 | 02 | 2013 | Eliminate or reduce compressed air usage | $7,863 | $12,000 | |
| MA0712 #01 Y:2013 | 01 | 2013 | Use radiant heater for spot heating | $13,420 | $65,327 | |
| BS0016 #06 Y:2013 | 06 | 2013 | Install vinyl strip / high speed / air curtain doors | $2,648 | $1,185 | |
| BS0016 #05 Y:2013 | 05 | 2013 | Install vinyl strip / high speed / air curtain doors | $1,127 | $6,826 | |
| BS0016 #04 Y:2013 | 04 | 2013 | Cover open tanks | $4,197 | $1,600 | |
| BS0016 #03 Y:2013 | 03 | 2013 | Insulate bare equipment | $437 | $604 | |
| BS0016 #02 Y:2013 | 02 | 2013 | Install compressor air intakes in coolest locations | $571 | $184 | |
| BS0016 #01 Y:2013 | 01 | 2013 | Upgrade controls on compressors | $15,856 | $27,630 | |
| SD0450 #05 Y:2012 | 05 | 2012 | Recover heat from exhausted steam, hot air or hot water | $8,500 | $25,000 | |
| SD0450 #04 Y:2012 | 04 | 2012 | Use photocell controls | $1,297 | $3,550 | |
| SD0450 #03 Y:2012 | 03 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,833 | $1,900 | |
| SD0450 #02 Y:2012 | 02 | 2012 | Reduce the pressure of compressed air to the minimum required | $3,795 | $200 | |
| SD0450 #01 Y:2012 | 01 | 2012 | Use minimum steam operating pressure | $8,111 | $200 | |
| LE0323 #09 Y:2011 | 09 | 2011 | Utilize energy-efficient belts and other improved mechanisms | $778 | - | |
| LE0323 #08 Y:2011 | 08 | 2011 | Utilize higher efficiency lamps and/or ballasts | $837 | $2,921 | |
| LE0323 #07 Y:2011 | 07 | 2011 | Use or replace with energy efficient substitutes | $1,240 | $542 | |
| LE0323 #06 Y:2011 | 06 | 2011 | Install soft-start to eliminate nuisance trips | $2,360 | $6,000 | |
| LE0323 #05 Y:2011 | 05 | 2011 | Use or replace with energy efficient substitutes | $2,867 | $192 | |
| LE0323 #04 Y:2011 | 04 | 2011 | Reschedule plant operations or reduce load to avoid peaks | $4,933 | $3,000 |