matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LS2302 #10 Y:2022 | 10 | 2022 | Utilize energy-efficient belts and other improved mechanisms | $194 | $700 | |
| LS2302 #09 Y:2022 | 09 | 2022 | Use adjustable frequency drive or multiple speed motors on existing system | $8,895 | $12,150 | |
| LS2302 #08 Y:2022 | 08 | 2022 | Utilize higher efficiency lamps and/or ballasts | $17,803 | $19,030 | |
| LS2302 #07 Y:2022 | 07 | 2022 | Install vinyl strip / high speed / air curtain doors | $5,715 | $3,600 | |
| LS2302 #06 Y:2022 | 06 | 2022 | Re-arrange equipment layout to reduce handling costs | $8,863 | $5,000 | |
| LS2302 #05 Y:2022 | 05 | 2022 | Reduce the pressure of compressed air to the minimum required | $210 | $25 | |
| LS2302 #04 Y:2022 | 04 | 2022 | Eliminate leaks in inert gas and compressed air lines/ valves | $819 | $90 | |
| LS2302 #03 Y:2022 | 03 | 2022 | Install occupancy sensors | $2,984 | $325 | |
| LS2302 #02 Y:2022 | 02 | 2022 | Separate and recycle scrap metal to foundry or for sale | $594 | - | |
| LS2302 #01 Y:2022 | 01 | 2022 | Sell / offer by-product as animal feed | $16,597 | - | |
| LT8368 #03 Y:2022 | 03 | 2022 | Install occupancy sensors | $585 | $852 | |
| LT8368 #02 Y:2022 | 02 | 2022 | Optimize plant power factor | $952 | $3,400 | |
| LT8368 #01 Y:2022 | 01 | 2022 | Use or replace with energy efficient substitutes | $5,357 | $5,022 | |
| NL0066 #08 Y:2022 | 08 | 2022 | Eliminate leaks in inert gas and compressed air lines/ valves | $431 | $500 | |
| NL0066 #07 Y:2022 | 07 | 2022 | Use heat pump for space conditioning | $1,731 | $8,247 | |
| NL0066 #06 Y:2022 | 06 | 2022 | Utilize higher efficiency lamps and/or ballasts | $4,513 | $7,203 | |
| NL0066 #05 Y:2022 | 05 | 2022 | Improve air circulation with destratification fans / other methods | $11,640 | $13,920 | |
| NL0066 #04 Y:2022 | 04 | 2022 | Replace existing hvac unit with high efficiency model | $16,645 | $32,028 | |
| NL0066 #03 Y:2022 | 03 | 2022 | Purchase new equipment to reduce material use / cost | $49,500 | $95,000 | |
| NL0066 #02 Y:2022 | 02 | 2022 | Add equipment/ operators to reduce production bottleneck | $250,000 | $150,000 |