ITAC Assessment: LS2302
ITAC logo
ITAC Assessment: LS2302
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Meat Seasoning
NAICS 311941: Mayonnaise, Dressing, and Other Prepared Sauce Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 90
Plant Area 256,140
ft2
Annual Production 17,000,000
lb
Production Hrs. Annual 3,510
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $446,839 4,453,000
kWh
Waste Disposal Costs
Solid Waste (non-haz) $22,632 319,090
lb
TOTAL YEARLY COSTS $469,471
RECOMMENDED SAVINGS* $62,674 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,787

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings
01 3.5317: Sell / offer by-product as animal feed $16,597 - - $16,597
-
lb
02 3.5248: Separate and recycle scrap metal to foundry or for sale $594 - - $594
-
lb
03 2.7135: Install occupancy sensors $2,984 $325 $2,984
29,843
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $819 $90 $819
8,192
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $210 $25 $210
2,097
kWh
-
06 4.514: Re-arrange equipment layout to reduce handling costs $8,863 $5,000 $8,863
88,633
kWh
-
07 2.7447: Install vinyl strip / high speed / air curtain doors $5,715 $3,600 $5,715
57,150
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $17,803 $19,030 $17,803
178,028
kWh
-
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,895 $12,150 $8,895
88,950
kWh
-
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $194 $700 $194
1,944
kWh
-
TOTAL RECOMMENDED $62,674 $40,920 $45,483
454,837
kWh
$17,191
-
lb
TOTAL IMPLEMENTED $20,787 $19,355 $20,787
207,871
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs