Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

349

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Seasoning and dressing manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0216 #05 Y:2005 Use synthetic lubricant $429 $200
LE0216 #04 Y:2005 Reduce the pressure of compressed air to the minimum required $1,613 $320
LE0216 #03 Y:2005 Reschedule plant operations or reduce load to avoid peaks $2,748 $2,000
LE0216 #02 Y:2005 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $3,467 $4,000
LE0216 #01 Y:2005 Utilize energy-efficient belts and other improved mechanisms $6,847 $1,200
OR0484 #03 Y:2005 Use most efficient type of electric motors $847 $1,013
OR0484 #02 Y:2005 Analyze flue gas for proper air/fuel ratio $2,710 $400
OR0484 #01 Y:2005 Use radiant heater for spot heating $41,089 $40,143
MA0575 #07 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $233 $30
MA0575 #06 Y:2005 Optimize plant power factor $512 $195
MA0575 #05 Y:2005 Reduce the pressure of compressed air to the minimum required $1,023 -
MA0575 #04 Y:2005 Insulate bare equipment $1,944 $7,285
MA0575 #03 Y:2005 Repair and eliminate steam leaks $18,805 $517
MA0575 #02 Y:2005 Add equipment/ operators to reduce production bottleneck $26,800 $41,620
MA0575 #01 Y:2005 Insulate bare equipment $68,834 $23,508
IA0359 #08 Y:2004 Re-arrange equipment layout to reduce handling costs $3,866 $1,223
IA0359 #07 Y:2004 Adjust burners for efficient operation $1,436 $1,000
IA0359 #06 Y:2004 Install occupancy sensors $299 $504
IA0359 #05 Y:2004 Utilize higher efficiency lamps and/or ballasts $518 $30,000
IA0359 #04 Y:2004 Upgrade controls on compressors $3,593 $500