Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

349

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Seasoning and dressing manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SJ0048 #07 Y:2026 Reduce space conditioning during non-working hours $1,595 -
SJ0048 #06 Y:2026 Re-use or recycle hot or cold process exhaust air $1,791 $1,127
SJ0048 #05 Y:2026 Utilize higher efficiency lamps and/or ballasts $6,383 $15,726
SJ0048 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $4,357 -
SJ0048 #03 Y:2026 Utilize controls to operate equipment only when needed $5,082 $13
SJ0048 #02 Y:2026 Insulate bare equipment $2,105 $1,983
SJ0048 #01 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $1,488 $7,009
LT8428 #10 Y:2025 Meter waste water $137,771 $13,815
LT8428 #09 Y:2025 Use solar heat to make electricty $150,032 $2,112,000
LT8428 #08 Y:2025 Use photocell controls $417 $340
LT8428 #07 Y:2025 Reduce the pressure of compressed air to the minimum required $2,778 -
LT8428 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $56,354 $50,550
LT8428 #05 Y:2025 Use most efficient type of electric motors $40,176 $29,500
LT8428 #04 Y:2025 Optimize plant power factor $2,409 $19,947
LT8428 #03 Y:2025 Modify refrigeration system to operate at a lower pressure $48,711 $140,984
LT8428 #02 Y:2025 Increase amount of condensate returned $194,116 $260,000
LT8428 #01 Y:2025 Reduce excessive boiler blowdown $18,242 $6,000
LS2413 #03 Y:2024 Install sensors to detect defects $5,700 $30,000
LS2413 #02 Y:2024 Modify process to reduce material use/cost $5,076 $16,000
LS2413 #01 Y:2024 Upgrade controls on compressors $68,225 $155,400