135
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| IC0125 #02 Y:2006 | 02 | 2006 | Recover waste heat from equipment | $305,019 | $900,000 | |
| IC0125 #01 Y:2006 | 01 | 2006 | Recover waste heat from equipment | $202,850 | $475,200 | |
| LE0246 #09 Y:2006 | 09 | 2006 | Install occupancy sensors | $1,586 | $450 | |
| LE0246 #08 Y:2006 | 08 | 2006 | Utilize higher efficiency lamps and/or ballasts | $10,948 | $180,000 | |
| LE0246 #07 Y:2006 | 07 | 2006 | Use utility controlled power management | $3,000 | $100 | |
| LE0246 #06 Y:2006 | 06 | 2006 | Utilize controls to operate equipment only when needed | $3,372 | $2,500 | |
| LE0246 #05 Y:2006 | 05 | 2006 | Use computer programs to optimize hvac performance | $6,033 | $5,000 | |
| LE0246 #04 Y:2006 | 04 | 2006 | Minimize water usage | $6,264 | $1,800 | |
| LE0246 #03 Y:2006 | 03 | 2006 | Reduce the pressure of compressed air to the minimum required | $9,683 | $6,700 | |
| LE0246 #02 Y:2006 | 02 | 2006 | Reuse rich white water in other applications | $14,590 | $20,000 | |
| LE0246 #01 Y:2006 | 01 | 2006 | Use small number of high output units instead of many small inefficient units | $66,327 | $5,000 | |
| WV0342 #17 Y:2006 | 17 | 2006 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,975 | $2,344 | |
| WV0342 #16 Y:2006 | 16 | 2006 | Reduce illumination to minimum necessary levels | $2,240 | $93 | |
| WV0342 #15 Y:2006 | 15 | 2006 | Utilize energy-efficient belts and other improved mechanisms | $3,938 | - | |
| WV0342 #14 Y:2006 | 14 | 2006 | Reduce the pressure of compressed air to the minimum required | $6,759 | $35 | |
| WV0342 #13 Y:2006 | 13 | 2006 | Develop a repair/replace policy | $11,020 | $1,348 | |
| WV0342 #12 Y:2006 | 12 | 2006 | Analyze flue gas for proper air/fuel ratio | $15,068 | $1,000 | |
| WV0342 #11 Y:2006 | 11 | 2006 | Insulate bare equipment | $18,125 | $2,570 | |
| WV0342 #10 Y:2006 | 10 | 2006 | Use synthetic lubricant | $23,049 | $280 | |
| WV0342 #09 Y:2006 | 09 | 2006 | Reschedule plant operations or reduce load to avoid peaks | $26,439 | $2,700 |