Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

135

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Flavoring syrup and concentrate manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0125 #02 Y:2006 Recover waste heat from equipment $305,019 $900,000
IC0125 #01 Y:2006 Recover waste heat from equipment $202,850 $475,200
LE0246 #09 Y:2006 Install occupancy sensors $1,586 $450
LE0246 #08 Y:2006 Utilize higher efficiency lamps and/or ballasts $10,948 $180,000
LE0246 #07 Y:2006 Use utility controlled power management $3,000 $100
LE0246 #06 Y:2006 Utilize controls to operate equipment only when needed $3,372 $2,500
LE0246 #05 Y:2006 Use computer programs to optimize hvac performance $6,033 $5,000
LE0246 #04 Y:2006 Minimize water usage $6,264 $1,800
LE0246 #03 Y:2006 Reduce the pressure of compressed air to the minimum required $9,683 $6,700
LE0246 #02 Y:2006 Reuse rich white water in other applications $14,590 $20,000
LE0246 #01 Y:2006 Use small number of high output units instead of many small inefficient units $66,327 $5,000
WV0342 #17 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $1,975 $2,344
WV0342 #16 Y:2006 Reduce illumination to minimum necessary levels $2,240 $93
WV0342 #15 Y:2006 Utilize energy-efficient belts and other improved mechanisms $3,938 -
WV0342 #14 Y:2006 Reduce the pressure of compressed air to the minimum required $6,759 $35
WV0342 #13 Y:2006 Develop a repair/replace policy $11,020 $1,348
WV0342 #12 Y:2006 Analyze flue gas for proper air/fuel ratio $15,068 $1,000
WV0342 #11 Y:2006 Insulate bare equipment $18,125 $2,570
WV0342 #10 Y:2006 Use synthetic lubricant $23,049 $280
WV0342 #09 Y:2006 Reschedule plant operations or reduce load to avoid peaks $26,439 $2,700