ITAC Assessment: WV0342
ITAC logo
ITAC Assessment: WV0342
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Dairy
NAICS 311930: Flavoring Syrup and Concentrate Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $100
M
to 500
M
# of Employees 370
Plant Area 450,000
ft2
Annual Production 75,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,364,436 60,885,145
kWh
Electricity Demand $806,671 106,421
kW-mo/yr
Electricity Fees $155,767 -
Natural Gas $3,768,559 445,178
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $795,728 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $714,641

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.2113: Repair or replace steam traps $151,419 $4,500 - - $151,944
-
MMBtu
$(-525.0) - -
02 2.4226: Use / purchase optimum sized compressor $124,707 $188,500 $88,096
3,526,400
kWh
$36,611
-
kW-mo/yr
- - - -
03 2.2121: Increase amount of condensate returned $103,142 $100,000 - - $75,349
-
MMBtu
- $20,000 $7,793
-
Tgal
04 2.1241: Reduce excessive boiler blowdown $87,693 $208,500 - - $44,052
-
MMBtu
$3,500 $14,747 $25,394
-
Tgal
05 2.2442: Preheat combustion air with waste heat $76,391 $42,250 - - $76,391
-
MMBtu
- - -
06 2.1213: Direct warmest air to combustion intake $74,909 $77,050 - - $74,909
-
MMBtu
- - -
07 2.1212: Operate boilers on high fire setting $41,893 $112,000 - - $41,893
-
MMBtu
- - -
08 2.4157: Establish a predictive maintenance program $26,961 $1,000 $20,315
813,075
kWh
$8,443
-
kW-mo/yr
- $(-1,797.0) - -
09 2.3131: Reschedule plant operations or reduce load to avoid peaks $26,439 $2,700 - $26,439
-
kW-mo/yr
- - - -
10 2.4314: Use synthetic lubricant $23,049 $280 $16,280
651,632
kWh
$6,769
-
kW-mo/yr
- - - -
11 2.2511: Insulate bare equipment $18,125 $2,570 - - $18,125
-
MMBtu
- - -
12 2.1233: Analyze flue gas for proper air/fuel ratio $15,068 $1,000 - - $15,068
-
MMBtu
- - -
13 2.4151: Develop a repair/replace policy $11,020 $1,348 $10,158
406,684
kWh
$4,222
-
kW-mo/yr
- $(-3,360.0) - -
14 2.4231: Reduce the pressure of compressed air to the minimum required $6,759 $35 $4,773
190,892
kWh
$1,986
-
kW-mo/yr
- - - -
15 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,938 - $2,782
111,340
kWh
$1,156
-
kW-mo/yr
- - - -
16 2.7111: Reduce illumination to minimum necessary levels $2,240 $93 $1,581
63,387
kWh
$659
-
kW-mo/yr
- - - -
17 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,975 $2,344 $1,596
63,847
kWh
$659
-
kW-mo/yr
- $(-280.0) - -
TOTAL RECOMMENDED $795,728 $744,170 $145,581
5,827,257
kWh
$86,944
-
kW-mo/yr
$497,731
-
MMBtu
$(-2,462.0) $34,747 $33,187
-
Tgal
TOTAL IMPLEMENTED $714,641 $667,027 $141,218
5,652,530
kWh
$85,129
-
kW-mo/yr
$422,822
-
MMBtu
$(-2,462.0) $34,747 $33,187
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs