| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SF0608 #09 Y:2023 | 09 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $14,376 | $15,156 | |
| SF0608 #08 Y:2023 | 08 | 2023 | Install vinyl strip / high speed / air curtain doors | $39,597 | $29,794 | |
| SF0608 #07 Y:2023 | 07 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $71,828 | $51,150 | |
| SF0608 #06 Y:2023 | 06 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $101,250 | $48,266 | |
| SF0608 #05 Y:2023 | 05 | 2023 | Utilize controls to operate equipment only when needed | $11,235 | $4,654 | |
| SF0608 #04 Y:2023 | 04 | 2023 | Turn off equipment when not in use | $1,050 | - | |
| SF0608 #03 Y:2023 | 03 | 2023 | Reduce space conditioning during non-working hours | $29,842 | $690 | |
| SF0608 #02 Y:2023 | 02 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $8,322 | - | |
| SF0608 #01 Y:2023 | 01 | 2023 | Chill water to the highest temperature possible | $16,747 | $400 | |
| GT0949 #07 Y:2020 | 07 | 2020 | Optimize plant power factor | $1,392 | $5,106 | |
| GT0949 #06 Y:2020 | 06 | 2020 | Turn off equipment during breaks, reduce operating time | $461 | $425 | |
| GT0949 #05 Y:2020 | 05 | 2020 | Eliminate leaks in inert gas and compressed air lines/ valves | $13,586 | $4,500 | |
| GT0949 #04 Y:2020 | 04 | 2020 | Install timers and/or thermostats | $2,159 | $451 | |
| GT0949 #03 Y:2020 | 03 | 2020 | Recharge batteries on during off-peak demand periods | $2,978 | $400 | |
| GT0949 #02 Y:2020 | 02 | 2020 | Apply for tax-free status for energy purchases | $19,356 | $2,000 | |
| GT0949 #01 Y:2020 | 01 | 2020 | Reduce the pressure of compressed air to the minimum required | $4,422 | $400 | |
| SF0556 #10 Y:2020 | 10 | 2020 | Recharge batteries on during off-peak demand periods | $2,250 | $1,064 | |
| SF0556 #09 Y:2020 | 09 | 2020 | Use solar heat to make electricty | $57,865 | $348,493 | |
| SF0556 #08 Y:2020 | 08 | 2020 | Utilize higher efficiency lamps and/or ballasts | $6,676 | $16,092 | |
| SF0556 #07 Y:2020 | 07 | 2020 | Use adjustable frequency drive or multiple speed motors on existing system | $2,455 | $3,366 |