Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product in shell walnuts, shelled walnuts
NAICS 311911: Roasted Nuts and Peanut Butter Manufacturing
SIC 2068: Salted and Roasted Nuts and Seeds
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 35,000
ft2
Annual Production 9,620
ton
Production Hrs. Annual 3,848
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,948 515,921
kWh
Electricity Demand $34,022 1,667
kW-mo/yr
Waste Disposal Costs
Water Usage $10,000 500
Tgal
TOTAL YEARLY COSTS $106,970
RECOMMENDED SAVINGS* $94,426 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $92,176

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Product Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,802 - $2,342
19,192
kWh
- $(-540.0) -
02 2.4322: Use or replace with energy efficient substitutes $4,683 $575 $4,683
38,385
kWh
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $959 $60 $780
6,397
kWh
$179
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,769 $2,289 $10,769
65,788
kWh
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,729 $864 $1,729
14,169
kWh
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,238 $5,536 $4,113
33,754
kWh
$1,125
-
kW-mo/yr
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,455 $3,366 $1,928
15,801
kWh
$527
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $6,676 $16,092 $4,924
40,354
kWh
$1,462
-
kW-mo/yr
$164 $126
09 2.9114: Use solar heat to make electricty $57,865 $348,493 $51,859
425,041
kWh
$6,006
-
kW-mo/yr
- -
10 2.3132: Recharge batteries on during off-peak demand periods $2,250 $1,064 - $2,250
-
kW-mo/yr
- -
TOTAL RECOMMENDED $94,426 $378,339 $83,127
658,881
kWh
$11,549
-
kW-mo/yr
$(-376.0) $126
TOTAL IMPLEMENTED $92,176 $377,275 $83,127
658,881
kWh
$9,299
-
kW-mo/yr
$(-376.0) $126