Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

203

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Roasted nuts and peanut butter manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0646 #11 Y:2026 Adopt in-house material generation $83,407 $93,469
SF0646 #10 Y:2026 Replace hydraulic / pneumatic equipment with electric equipment $1,211 $4,781
SF0646 #09 Y:2026 Use waste heat from hot flue gases to preheat incoming fluids $20,686 $67,885
SF0646 #08 Y:2026 Insulate bare equipment $2,534 $3,080
SF0646 #07 Y:2026 Reduce space conditioning during non-working hours $1,975 $1,241
SF0646 #06 Y:2026 Analyze flue gas for proper air/fuel ratio $18,177 -
SF0646 #05 Y:2026 Turn off equipment when not in use $1,080 -
SF0646 #04 Y:2026 Make a practice of turning off lights when not needed $848 -
SF0646 #03 Y:2026 Repair and eliminate steam leaks $7,140 -
SF0646 #02 Y:2026 Reduce the pressure of compressed air to the minimum required $5,448 $160
SF0646 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $8,904 -
TR0049 #04 Y:2023 Apply for tax-free status for energy purchases $3,612 $2,500
TR0049 #03 Y:2023 Replace existing hvac unit with high efficiency model $1,525 $3,675
TR0049 #02 Y:2023 Use solar heat to make electricty $13,577 $109,805
TR0049 #01 Y:2023 Install compressor air intakes in coolest locations $82 $389
SF0611 #06 Y:2023 Use solar heat to make electricty $165,339 $1,651,070
SF0611 #05 Y:2023 Preheat boiler makeup water with waste process heat $8,909 $18,675
SF0611 #04 Y:2023 Eliminate or reduce compressed air usage $6,353 $2,100
SF0611 #03 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $61,975 $1,800
SF0611 #02 Y:2023 Turn off equipment when not in use $4,908 -