ITAC Assessment: TR0049
ITAC logo
ITAC Assessment: TR0049
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product potato, peanut and snacks
NAICS 311911: Roasted Nuts and Peanut Butter Manufacturing
SIC 2064: Candy and Other Confectionery Products
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 17,872
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $18,652 316,162
kWh
Electricity Demand $11,940 1,443
kW-mo/yr
Electricity Fees $5,641 -
LPG $49,714 2,700
MMBtu
TOTAL YEARLY COSTS $85,948
RECOMMENDED SAVINGS* $18,796 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4221: Install compressor air intakes in coolest locations $82 $389 $46
773
kWh
$37
-
kW-mo/yr
-
02 2.9114: Use solar heat to make electricty $13,577 $109,805 $10,717
181,658
kWh
$2,860
-
kW-mo/yr
-
03 2.7232: Replace existing hvac unit with high efficiency model $1,525 $3,675 $1,279
21,681
kWh
$246
-
kW-mo/yr
-
04 2.8121: Apply for tax-free status for energy purchases $3,612 $2,500 - - $3,612
TOTAL RECOMMENDED $18,796 $116,369 $12,041
204,112
kWh
$3,142
-
kW-mo/yr
$3,612
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs