Assessment Year | 1998 |
---|---|
Principal Product | frozen fried fish |
NAICS |
n/a
|
SIC | 2092: Prepared Fresh or Frozen Fish and Seafoods |
Sales Range | $10 M to 50M |
# of Employees | 175 |
Plant Area |
151,000
ft2
|
Annual Production | 50,000,000
lb
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $857,860 | 10,490,328 |
kWh
|
$0.082 |
Electricity Demand | $233,673 | 28,107 |
kW-mo/yr
|
$8.31 |
Electricity Fees | $7,427 | - |
|
- |
Natural Gas | $162,907 | 25,923 |
MMBtu
|
$6.28 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $166,530 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $58,315 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Water Consumption Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $30,662 | $83,099 |
$25,702
321,512
kWh
|
$4,960
-
kW-mo/yr
|
- | - | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,977 | $26,897 |
$7,937
99,355
kWh
|
$4,040
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.8114: Change rate schedules or other changes in utility service | $12,878 | $10,000 | - | - | - | - | - | - | $12,878 | |
04 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $12,836 | $29,200 | - | - | - |
$12,836
-
MMBtu
|
- | - | - | |
05 | 2.6123: Remove unneeded service lines to eliminate potential leaks | $1,600 | $3,600 | - | - | - | - | $1,600 | - | - | |
06 | 2.2425: Use flue gases to heat process or service water | $1,571 | $5,022 | - | - | - |
$1,571
-
MMBtu
|
- | - | - | |
07 | 2.8123: Pay utility bills on time | $1,227 | - | - | - | $1,227 | - | - | - | - | |
08 | 4.652: Replace existing equipment with more suitable substitutes | $92,343 | $1,105,000 | - | - | - |
$76,215
-
MMBtu
|
- | - | $16,128 | |
09 | 3.4115: Recover and reuse cooling water | $1,436 | $1,150 | - | - | - | - | - |
$1,436
-
Tgal
|
- | |
TOTAL RECOMMENDED | $166,530 | $1,263,968 |
$33,639
420,867
kWh
|
$9,000
-
kW-mo/yr
|
$1,227 |
$90,622
-
MMBtu
|
$1,600 |
$1,436
-
Tgal
|
$29,006 | ||
TOTAL IMPLEMENTED | $58,315 | $125,018 |
$33,639
420,867
kWh
|
$9,000
-
kW-mo/yr
|
$1,227 |
$1,571
-
MMBtu
|
- | - | $12,878 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Water Consumption Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs