| Assessment Year | 1998 |
|---|---|
| Principal Product | frozen fried fish |
| NAICS |
n/a
|
| SIC | 2092: Prepared Fresh or Frozen Fish and Seafoods |
| Sales Range | $10 M to 50M |
| # of Employees | 175 |
| Plant Area |
151,000
ft2
|
| Annual Production | 50,000,000
lb
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | New Hampshire |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $857,860 | 10,490,328 |
kWh
|
$0.082 |
| Electricity Demand | $233,673 | 28,107 |
kW-mo/yr
|
$8.31 |
| Electricity Fees | $7,427 | - |
|
- |
| Natural Gas | $162,907 | 25,923 |
MMBtu
|
$6.28 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $166,530 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $58,315 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Water Consumption Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $30,662 | $83,099 |
$25,702
321,512
kWh
|
$4,960
-
kW-mo/yr
|
- | - | - | - | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,977 | $26,897 |
$7,937
99,355
kWh
|
$4,040
-
kW-mo/yr
|
- | - | - | - | - | |
| 03 | 2.8114: Change rate schedules or other changes in utility service | $12,878 | $10,000 | - | - | - | - | - | - | $12,878 | |
| 04 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $12,836 | $29,200 | - | - | - |
$12,836
-
MMBtu
|
- | - | - | |
| 05 | 2.6123: Remove unneeded service lines to eliminate potential leaks | $1,600 | $3,600 | - | - | - | - | $1,600 | - | - | |
| 06 | 2.2425: Use flue gases to heat process or service water | $1,571 | $5,022 | - | - | - |
$1,571
-
MMBtu
|
- | - | - | |
| 07 | 2.8123: Pay utility bills on time | $1,227 | - | - | - | $1,227 | - | - | - | - | |
| 08 | 4.652: Replace existing equipment with more suitable substitutes | $92,343 | $1,105,000 | - | - | - |
$76,215
-
MMBtu
|
- | - | $16,128 | |
| 09 | 3.4115: Recover and reuse cooling water | $1,436 | $1,150 | - | - | - | - | - |
$1,436
-
Tgal
|
- | |
| TOTAL RECOMMENDED | $166,530 | $1,263,968 |
$33,639
420,867
kWh
|
$9,000
-
kW-mo/yr
|
$1,227 |
$90,622
-
MMBtu
|
$1,600 |
$1,436
-
Tgal
|
$29,006 | ||
| TOTAL IMPLEMENTED | $58,315 | $125,018 |
$33,639
420,867
kWh
|
$9,000
-
kW-mo/yr
|
$1,227 |
$1,571
-
MMBtu
|
- | - | $12,878 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Water Consumption Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs