ITAC Assessment: ME0253
ITAC logo
ITAC Assessment: ME0253
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product frozen fried fish
NAICS
n/a
SIC 2092: Prepared Fresh or Frozen Fish and Seafoods
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 151,000
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $857,860 10,490,328
kWh
Electricity Demand $233,673 28,107
kW-mo/yr
Electricity Fees $7,427 -
Natural Gas $162,907 25,923
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $166,530 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $58,315

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings
01 2.4133: Use most efficient type of electric motors $30,662 $83,099 $25,702
321,512
kWh
$4,960
-
kW-mo/yr
- - - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $11,977 $26,897 $7,937
99,355
kWh
$4,040
-
kW-mo/yr
- - - - -
03 2.8114: Change rate schedules or other changes in utility service $12,878 $10,000 - - - - - - $12,878
04 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $12,836 $29,200 - - - $12,836
-
MMBtu
- - -
05 2.6123: Remove unneeded service lines to eliminate potential leaks $1,600 $3,600 - - - - $1,600 - -
06 2.2425: Use flue gases to heat process or service water $1,571 $5,022 - - - $1,571
-
MMBtu
- - -
07 2.8123: Pay utility bills on time $1,227 - - - $1,227 - - - -
08 4.652: Replace existing equipment with more suitable substitutes $92,343 $1,105,000 - - - $76,215
-
MMBtu
- - $16,128
09 3.4115: Recover and reuse cooling water $1,436 $1,150 - - - - - $1,436
-
Tgal
-
TOTAL RECOMMENDED $166,530 $1,263,968 $33,639
420,867
kWh
$9,000
-
kW-mo/yr
$1,227 $90,622
-
MMBtu
$1,600 $1,436
-
Tgal
$29,006
TOTAL IMPLEMENTED $58,315 $125,018 $33,639
420,867
kWh
$9,000
-
kW-mo/yr
$1,227 $1,571
-
MMBtu
- - $12,878
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs