| UD0874 #11 Y:2012 | 11 | 2012 | Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust | $317,641 | $906,381 | |
| UD0874 #10 Y:2012 | 10 | 2012 | Replace existing hvac unit with high efficiency model | $10,382 | $30,000 | |
| UD0874 #09 Y:2012 | 09 | 2012 | Analyze flue gas for proper air/fuel ratio | $4,928 | $12,300 | |
| UD0874 #08 Y:2012 | 08 | 2012 | Replace obsolete burners with more efficient ones | $58,058 | $88,200 | |
| UD0874 #07 Y:2012 | 07 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,535 | - | |
| UD0874 #06 Y:2012 | 06 | 2012 | Size electric motors for peak operating efficiency | $95,537 | $39,093 | |
| UD0874 #05 Y:2012 | 05 | 2012 | Utilize higher efficiency lamps and/or ballasts | $1,338 | $6,405 | |
| UD0874 #04 Y:2012 | 04 | 2012 | Utilize higher efficiency lamps and/or ballasts | $8,148 | $51,240 | |
| UD0874 #03 Y:2012 | 03 | 2012 | Utilize higher efficiency lamps and/or ballasts | $6,108 | $38,600 | |
| UD0874 #02 Y:2012 | 02 | 2012 | Replace city water with recycled water via cooling tower | $16,400 | $200 | |
| UD0874 #01 Y:2012 | 01 | 2012 | Optimize plant power factor | $23,112 | $20,000 | |
| BS0010 #05 Y:2012 | 05 | 2012 | Recharge batteries on during off-peak demand periods | $70 | $60 | |
| BS0010 #04 Y:2012 | 04 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $645 | $251 | |
| BS0010 #03 Y:2012 | 03 | 2012 | Reduce the pressure of compressed air to the minimum required | $6,826 | $750 | |
| BS0010 #02 Y:2012 | 02 | 2012 | Insulate bare equipment | $222 | $512 | |
| BS0010 #01 Y:2012 | 01 | 2012 | Reduce illumination to minimum necessary levels | $289 | $630 | |
| LE0348 #08 Y:2012 | 08 | 2012 | Reduce the pressure of compressed air to the minimum required | $120 | $40 | |
| LE0348 #07 Y:2012 | 07 | 2012 | Utilize higher efficiency lamps and/or ballasts | $1,956 | $5,700 | |
| LE0348 #06 Y:2012 | 06 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,650 | $1,600 | |
| LE0348 #05 Y:2012 | 05 | 2012 | Repair and eliminate steam leaks | $2,368 | $2,300 |