Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

87

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0874 #11 Y:2012 Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $317,641 $906,381
UD0874 #10 Y:2012 Replace existing hvac unit with high efficiency model $10,382 $30,000
UD0874 #09 Y:2012 Analyze flue gas for proper air/fuel ratio $4,928 $12,300
UD0874 #08 Y:2012 Replace obsolete burners with more efficient ones $58,058 $88,200
UD0874 #07 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $2,535 -
UD0874 #06 Y:2012 Size electric motors for peak operating efficiency $95,537 $39,093
UD0874 #05 Y:2012 Utilize higher efficiency lamps and/or ballasts $1,338 $6,405
UD0874 #04 Y:2012 Utilize higher efficiency lamps and/or ballasts $8,148 $51,240
UD0874 #03 Y:2012 Utilize higher efficiency lamps and/or ballasts $6,108 $38,600
UD0874 #02 Y:2012 Replace city water with recycled water via cooling tower $16,400 $200
UD0874 #01 Y:2012 Optimize plant power factor $23,112 $20,000
BS0010 #05 Y:2012 Recharge batteries on during off-peak demand periods $70 $60
BS0010 #04 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $645 $251
BS0010 #03 Y:2012 Reduce the pressure of compressed air to the minimum required $6,826 $750
BS0010 #02 Y:2012 Insulate bare equipment $222 $512
BS0010 #01 Y:2012 Reduce illumination to minimum necessary levels $289 $630
LE0348 #08 Y:2012 Reduce the pressure of compressed air to the minimum required $120 $40
LE0348 #07 Y:2012 Utilize higher efficiency lamps and/or ballasts $1,956 $5,700
LE0348 #06 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $3,650 $1,600
LE0348 #05 Y:2012 Repair and eliminate steam leaks $2,368 $2,300