Assessment Year | 2012 |
---|---|
Principal Product | Deli Salads |
NAICS | 311991: Perishable Prepared Food Manufacturing |
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 12 |
Plant Area |
30,384
ft2
|
Annual Production | 5,000,000
lb
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $122,721 | 954,240 |
kWh
|
$0.13 |
Natural Gas | $60,798 | 3,953 |
MMBtu
|
$15.38 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $56,810 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $39,676 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $31,702 | $24,000 |
$31,702
245,755
kWh
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,828 | $5,000 |
$2,828
21,923
kWh
|
- | |
03 | 2.2442: Preheat combustion air with waste heat | $12,235 | $43,550 | - |
$12,235
-
MMBtu
|
|
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,951 | $1,940 | - |
$1,951
-
MMBtu
|
|
05 | 2.2135: Repair and eliminate steam leaks | $2,368 | $2,300 | - |
$2,368
-
MMBtu
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,650 | $1,600 |
$3,650
28,293
kWh
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,956 | $5,700 |
$1,956
14,934
kWh
|
- | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $120 | $40 |
$120
929
kWh
|
- | |
TOTAL RECOMMENDED | $56,810 | $84,130 |
$40,256
311,834
kWh
|
$16,554
-
MMBtu
|
||
TOTAL IMPLEMENTED | $39,676 | $33,600 |
$37,308
288,982
kWh
|
$2,368
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs