ITAC Assessment: LE0348
ITAC logo
ITAC Assessment: LE0348
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Deli Salads
NAICS 311991: Perishable Prepared Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 12
Plant Area 30,384
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 2,600
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $122,721 954,240
kWh
Natural Gas $60,798 3,953
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,810 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,676

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $31,702 $24,000 $31,702
245,755
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,828 $5,000 $2,828
21,923
kWh
-
03 2.2442: Preheat combustion air with waste heat $12,235 $43,550 - $12,235
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,951 $1,940 - $1,951
-
MMBtu
05 2.2135: Repair and eliminate steam leaks $2,368 $2,300 - $2,368
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,650 $1,600 $3,650
28,293
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,956 $5,700 $1,956
14,934
kWh
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $120 $40 $120
929
kWh
-
TOTAL RECOMMENDED $56,810 $84,130 $40,256
311,834
kWh
$16,554
-
MMBtu
TOTAL IMPLEMENTED $39,676 $33,600 $37,308
288,982
kWh
$2,368
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs