ITAC Assessment: MA0009
ITAC logo
ITAC Assessment: MA0009
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product POLYETHYLENE BAGS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 22
Plant Area
n/a
Annual Production 4,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,276 691,090
kWh
Fuel Oil #2 $1,813 238
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,489 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,283

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.2511: Insulate bare equipment $2,206 $2,100 $2,206
32,239
kWh
02 2.6232: Install set-back timers $1,183 $200 $1,183
17,292
kWh
03 2.6121: Reduce hot water temperature to the minimum required $100 - $100
1,465
kWh
TOTAL RECOMMENDED $3,489 $2,300 $3,489
50,996
kWh
TOTAL IMPLEMENTED $1,283 $200 $1,283
18,757
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs