Assessment Year | 1994 |
---|---|
Principal Product | semiconductors |
NAICS |
n/a
|
SIC | 3674: Semiconductors and Related Devices |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
69,000
ft2
|
Annual Production | 4,800,000
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $135,910 | 4,929,953 |
kWh
|
$0.028 |
Natural Gas | $32,240 | 8,529 |
MMBtu
|
$3.78 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,360 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,030 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.2623: Minimize condenser cooling water temperature | $7,950 | $30 |
$7,950
192,556
kWh
|
- | - | |
02 | 3.8132: Use less toxic and volatile solvent substitutes | $1,290 | - | - | - |
$1,290
-
lb
|
|
03 | 2.4221: Install compressor air intakes in coolest locations | $1,070 | $1,770 |
$1,070
25,791
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,010 | $5,310 |
$1,010
24,619
kWh
|
- | - | |
05 | 2.2437: Recover waste heat from equipment | $630 | $650 | - |
$630
-
MMBtu
|
- | |
06 | 2.2628: Utilize a less expensive cooling method | $410 | $2,000 |
$410
9,965
kWh
|
- | - | |
TOTAL RECOMMENDED | $12,360 | $9,760 |
$10,440
252,931
kWh
|
$630
-
MMBtu
|
$1,290
-
lb
|
||
TOTAL IMPLEMENTED | $10,030 | $7,110 |
$10,030
242,966
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs