ITAC Assessment: CO0315
ITAC logo
ITAC Assessment: CO0315
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product semiconductors
NAICS
n/a
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 69,000
ft2
Annual Production 4,800,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,910 4,929,953
kWh
Natural Gas $32,240 8,529
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,360 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,030

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (haz) Savings
01 2.2623: Minimize condenser cooling water temperature $7,950 $30 $7,950
192,556
kWh
- -
02 3.8132: Use less toxic and volatile solvent substitutes $1,290 - - - $1,290
-
lb
03 2.4221: Install compressor air intakes in coolest locations $1,070 $1,770 $1,070
25,791
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,010 $5,310 $1,010
24,619
kWh
- -
05 2.2437: Recover waste heat from equipment $630 $650 - $630
-
MMBtu
-
06 2.2628: Utilize a less expensive cooling method $410 $2,000 $410
9,965
kWh
- -
TOTAL RECOMMENDED $12,360 $9,760 $10,440
252,931
kWh
$630
-
MMBtu
$1,290
-
lb
TOTAL IMPLEMENTED $10,030 $7,110 $10,030
242,966
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs