Assessment Year | 2003 |
---|---|
Principal Product | refrigerator and freezer gaskets |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 95 |
Plant Area |
57,000
ft2
|
Annual Production | 7,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $149,498 | 3,144,520 |
kWh
|
$0.048 |
Electricity Demand | $75,240 | 7,212 |
kW-mo/yr
|
$10.43 |
Natural Gas | $28,375 | 4,280 |
MMBtu
|
$6.63 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $21,629 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,451 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,170 | $533 |
$5,067
104,900
kWh
|
$2,103
-
kW-mo/yr
|
|
02 | 2.4221: Install compressor air intakes in coolest locations | $4,024 | $250 |
$2,763
57,158
kWh
|
$1,261
-
kW-mo/yr
|
|
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,437 | $22 |
$986
20,405
kWh
|
$451
-
kW-mo/yr
|
|
04 | 2.4226: Use / purchase optimum sized compressor | $7,549 | $11,250 |
$7,549
156,291
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $797 | $1,198 |
$540
11,170
kWh
|
$257
-
kW-mo/yr
|
|
06 | 2.7135: Install occupancy sensors | $629 | $1,330 |
$629
12,987
kWh
|
- | |
07 | 2.4133: Use most efficient type of electric motors | $23 | $42 |
$17
355
kWh
|
$6
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $21,629 | $14,625 |
$17,551
363,266
kWh
|
$4,078
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $13,451 | $2,045 |
$9,373
193,988
kWh
|
$4,078
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs