Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,972

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0646 #07 Y:2026 Reduce space conditioning during non-working hours $1,975 $1,241
SF0646 #06 Y:2026 Analyze flue gas for proper air/fuel ratio $18,177 -
SF0646 #05 Y:2026 Turn off equipment when not in use $1,080 -
SF0646 #04 Y:2026 Make a practice of turning off lights when not needed $848 -
SF0646 #03 Y:2026 Repair and eliminate steam leaks $7,140 -
SF0646 #02 Y:2026 Reduce the pressure of compressed air to the minimum required $5,448 $160
SF0646 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $8,904 -
KS2546 #05 Y:2025 Use solar heat to make electricty $42,845 $592,900
KS2546 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $3,018 $11,052
KS2546 #03 Y:2025 Use / purchase optimum sized compressor $11,794 $101,678
KS2546 #02 Y:2025 Reduce the pressure of compressed air to the minimum required $2,371 $120
KS2546 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,988 $5,480
MZ0390 #08 Y:2025 Use or replace with energy efficient substitutes $2,878 $1,700
MZ0390 #07 Y:2025 Install occupancy sensors $196 $725
MZ0390 #06 Y:2025 Reduce the pressure of compressed air to the minimum required $3,595 $1,000
MZ0390 #05 Y:2025 Use waste heat from hot flue gases to preheat incoming fluids $11,755 $46,600
MZ0390 #04 Y:2025 Analyze flue gas for proper air/fuel ratio $7,996 $1,600
MZ0390 #03 Y:2025 Chill water to the highest temperature possible $9,218 $13,460
MZ0390 #02 Y:2025 Minimize condenser cooling water temperature $8,616 $19,492
MZ0390 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $23,516 $17,100