| Assessment Year | 2026 |
|---|---|
| Principal Product | Packaged Almonds |
| NAICS | 311911: Roasted Nuts and Peanut Butter Manufacturing |
| SIC | 2068: Salted and Roasted Nuts and Seeds |
| Sales Range | $100 M to 500M |
| # of Employees | 130 |
| Plant Area |
115,000
ft2
|
| Annual Production | 104,000,000
lb
|
| Production Hrs. Annual | 6,696
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $400,424 | 3,852,200 |
kWh
|
$0.10 | |
| Electricity Demand | $111,177 | 8,660 |
kW-mo/yr
|
$12.84 | |
| LPG | $493,879 | 31,975 |
MMBtu
|
$15.45 | |
| Waste Disposal Costs | |||||
| Water Usage | $65,986 | 192 |
Tgal
|
$342.96 | |
| TOTAL YEARLY COSTS | $1,071,466 | ||||
| RECOMMENDED SAVINGS* | $151,410 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,904 | - |
$9,544
91,856
kWh
|
- | - | $(-640.0) | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,448 | $160 |
$4,370
42,060
kWh
|
$1,078
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.2135: Repair and eliminate steam leaks | $7,140 | - | - | - |
$7,780
-
MMBtu
|
$(-640.0) | - | |
| 04 | 2.7124: Make a practice of turning off lights when not needed | $848 | - |
$848
8,165
kWh
|
- | - | - | - | |
| 05 | 2.6218: Turn off equipment when not in use | $1,080 | - |
$1,080
10,395
kWh
|
- | - | - | - | |
| 06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $18,177 | - | - | - |
$20,177
-
MMBtu
|
$(-2,000.0) | - | |
| 07 | 2.7224: Reduce space conditioning during non-working hours | $1,975 | $1,241 |
$1,975
19,013
kWh
|
- | - | - | - | |
| 08 | 2.2511: Insulate bare equipment | $2,534 | $3,080 | - | - |
$2,534
-
MMBtu
|
- | - | |
| 09 | 2.2427: Use waste heat from hot flue gases to preheat incoming fluids | $20,686 | $67,885 | - | - |
$20,686
-
MMBtu
|
- | - | |
| 10 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $1,211 | $4,781 |
$1,211
11,657
kWh
|
- | - | - | - | |
| 11 | 4.212: Adopt in-house material generation | $83,407 | $93,469 | - | - | - | - | $83,407 | |
| TOTAL RECOMMENDED | $151,410 | $170,616 |
$19,028
183,146
kWh
|
$1,078
-
kW-mo/yr
|
$51,177
-
MMBtu
|
$(-3,280.0) | $83,407 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs