ITAC Assessment: SF0646
ITAC logo
ITAC Assessment: SF0646
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Packaged Almonds
NAICS 311911: Roasted Nuts and Peanut Butter Manufacturing
SIC 2068: Salted and Roasted Nuts and Seeds
Sales Range $100
M
to 500
M
# of Employees 130
Plant Area 115,000
ft2
Annual Production 104,000,000
lb
Production Hrs. Annual 6,696
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $400,424 3,852,200
kWh
Electricity Demand $111,177 8,660
kW-mo/yr
LPG $493,879 31,975
MMBtu
Waste Disposal Costs
Water Usage $65,986 192
Tgal
TOTAL YEARLY COSTS $1,071,466
RECOMMENDED SAVINGS* $151,410 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,904 - $9,544
91,856
kWh
- - $(-640.0) -
02 2.4231: Reduce the pressure of compressed air to the minimum required $5,448 $160 $4,370
42,060
kWh
$1,078
-
kW-mo/yr
- - -
03 2.2135: Repair and eliminate steam leaks $7,140 - - - $7,780
-
MMBtu
$(-640.0) -
04 2.7124: Make a practice of turning off lights when not needed $848 - $848
8,165
kWh
- - - -
05 2.6218: Turn off equipment when not in use $1,080 - $1,080
10,395
kWh
- - - -
06 2.1233: Analyze flue gas for proper air/fuel ratio $18,177 - - - $20,177
-
MMBtu
$(-2,000.0) -
07 2.7224: Reduce space conditioning during non-working hours $1,975 $1,241 $1,975
19,013
kWh
- - - -
08 2.2511: Insulate bare equipment $2,534 $3,080 - - $2,534
-
MMBtu
- -
09 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $20,686 $67,885 - - $20,686
-
MMBtu
- -
10 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $1,211 $4,781 $1,211
11,657
kWh
- - - -
11 4.212: Adopt in-house material generation $83,407 $93,469 - - - - $83,407
TOTAL RECOMMENDED $151,410 $170,616 $19,028
183,146
kWh
$1,078
-
kW-mo/yr
$51,177
-
MMBtu
$(-3,280.0) $83,407
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs