Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,856

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LT8428 #10 Y:2025 Meter waste water $137,009 $13,815
LT8428 #09 Y:2025 Use solar heat to make electricty $150,032 $2,112,000
LT8428 #08 Y:2025 Use photocell controls $417 $340
LT8428 #07 Y:2025 Reduce the pressure of compressed air to the minimum required $2,778 -
LT8428 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $56,354 $50,550
LT8428 #05 Y:2025 Use most efficient type of electric motors $40,176 $29,500
LT8428 #04 Y:2025 Optimize plant power factor $2,409 $19,947
LT8428 #03 Y:2025 Modify refrigeration system to operate at a lower pressure $48,711 $140,984
LT8428 #02 Y:2025 Increase amount of condensate returned $192,452 $260,000
LT8428 #01 Y:2025 Reduce excessive boiler blowdown $18,064 $6,000
NL0118 #05 Y:2025 Utilize energy-efficient belts and other improved mechanisms $634 $608
NL0118 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $636 $165
NL0118 #03 Y:2025 Meter waste water $857 $985
NL0118 #02 Y:2025 Meter waste water $3,352 $1,575
NL0118 #01 Y:2025 Recharge batteries on during off-peak demand periods $15,441 $550
LS2517 #06 Y:2025 Use solar heat to make electricty $38,117 $526,500
LS2517 #05 Y:2025 Replace existing hvac unit with high efficiency model $4,478 $39,636
LS2517 #04 Y:2025 Clean or color roof to reduce solar load $4,606 $17,913
LS2517 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $3,367 $3,470
LS2517 #02 Y:2025 Install timers and/or thermostats $13,011 $50