Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

106

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Frozen cakes, pies, and other pastries manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0342 #01 Y:2007 Modify refrigeration system to operate at a lower pressure $250,944 $80,000
SD0385 #05 Y:2006 Install equipment (eg compactor) to reduce disposal costs $5,989 $19,500
SD0385 #04 Y:2006 Utilize higher efficiency lamps and/or ballasts $1,469 $17,804
SD0385 #03 Y:2006 Install skylights $4,712 $6,400
SD0385 #02 Y:2006 Utilize higher efficiency lamps and/or ballasts $10,090 $17,767
SD0385 #01 Y:2006 Utilize a less expensive cooling method $273,018 $135,000
MA0603 #17 Y:2006 Minimize operation of equipment maintained in standby condition $172 -
MA0603 #16 Y:2006 Install compressor air intakes in coolest locations $650 $4,000
MA0603 #15 Y:2006 Reduce the pressure of compressed air to the minimum required $874 $4,000
MA0603 #14 Y:2006 Minimize operation of equipment maintained in standby condition $1,402 -
MA0603 #13 Y:2006 Repair or replace steam traps $2,847 $1,600
MA0603 #12 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $3,508 $10,500
MA0603 #11 Y:2006 Burn waste oil for heat $3,685 $6,500
MA0603 #10 Y:2006 Modify refrigeration system to operate at a lower pressure $4,287 -
MA0603 #09 Y:2006 Recover waste heat from equipment $8,490 $6,000
MA0603 #08 Y:2006 Size electric motors for peak operating efficiency $16,480 $50,000
MA0603 #07 Y:2006 Utilize a less expensive cooling method $16,595 $83,500
MA0603 #06 Y:2006 Use utility controlled power management $24,068 -
MA0603 #05 Y:2006 Use hot process fluids to preheat incoming process fluids $26,243 $30,600
MA0603 #04 Y:2006 Lower temperature during the winter season and vice-versa $34,778 $8,125