ITAC Assessment: SD0385
ITAC logo
ITAC Assessment: SD0385
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Cakes
NAICS 311813: Frozen Cakes, Pies, and Other Pastries Manufacturing
SIC 2053: Frozen Bakery Products, Except Bread
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 52,000
ft2
Annual Production 38,000,000
lb
Production Hrs. Annual 6,600
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Natural Gas $247,894 12,539
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $295,278 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,090

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.2628: Utilize a less expensive cooling method $273,018 $135,000 $(-10,779.0)
(-141,628)
kWh
$(-3,203.0)
-
kW-mo/yr
- $287,000
02 2.7142: Utilize higher efficiency lamps and/or ballasts $10,090 $17,767 $7,773
102,148
kWh
$2,317
-
kW-mo/yr
- -
03 2.7145: Install skylights $4,712 $6,400 $3,728
48,989
kWh
$984
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,469 $17,804 $1,133
14,889
kWh
$336
-
kW-mo/yr
- -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $5,989 $19,500 - - $5,989
-
lb
-
TOTAL RECOMMENDED $295,278 $196,471 $1,855
24,398
kWh
$434
-
kW-mo/yr
$5,989
-
lb
$287,000
TOTAL IMPLEMENTED $10,090 $17,767 $7,773
102,148
kWh
$2,317
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs