ITAC Assessment: MS0265
ITAC logo
ITAC Assessment: MS0265
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Wire Cloth
NAICS 332618: Other Fabricated Wire Product Manufacturing
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 165,000
ft2
Annual Production 1,000
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $195,007 4,376,577
kWh
Electricity Demand $36,203 10,295
kW-mo/yr
Electricity Fees $81,873 -
Natural Gas $26,476 2,818
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,385 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,455

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $36,775 $59,467 $18,681
560,519
kWh
$2,804
-
kW-mo/yr
$15,290 - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $10,523 $32,157 $5,341
160,261
kWh
$809
-
kW-mo/yr
$4,373 - -
03 2.7124: Make a practice of turning off lights when not needed $5,480 $2,430 $3,069
92,084
kWh
- $2,411 - -
04 3.6124: Burn waste oil for heat $3,362 $3,129 - - - $1,362
-
MMBtu
$2,000
-
gal
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,680 $189 $941
28,245
kWh
- $739 - -
06 2.7261: Install timers and/or thermostats $791 $472 $443
13,291
kWh
- $348 - -
07 2.6214: Shut off pilots in standby equipment $774 $176 - - - $774
-
MMBtu
-
TOTAL RECOMMENDED $59,385 $98,020 $28,475
854,400
kWh
$3,613
-
kW-mo/yr
$23,161 $2,136
-
MMBtu
$2,000
-
gal
TOTAL IMPLEMENTED $38,455 $59,656 $19,622
588,764
kWh
$2,804
-
kW-mo/yr
$16,029 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs