ITAC Assessment: GT0776
ITAC logo
ITAC Assessment: GT0776
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product CARPET YARN
NAICS 313110: Fiber, Yarn, and Thread Mills
SIC 2281: Yarn Spinning Mills
Sales Range $10
M
to 50
M
# of Employees 310
Plant Area 247,321
ft2
Annual Production 29,750
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,408,507 32,341,037
kWh
Natural Gas $361,839 71,272
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $160,924 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.1111: Control pressure on steamer operations $1,335 - n/a - $1,335
-
MMBtu
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,581 $550 n/a $1,581
36,271
kWh
- - -
03 2.2511: Insulate bare equipment $330 $83 n/a - $330
-
MMBtu
- -
04 2.4312: Improve lubrication practices $14,283 - n/a $14,283
327,600
kWh
- - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $11,980 $13,020 n/a $11,980
274,775
kWh
- - -
06 2.4322: Use or replace with energy efficient substitutes $649 $530 n/a $649
14,874
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $51,823 $73,750 n/a $51,823
1,188,600
kWh
- - -
08 3.4141: Replace the chlorination stage with an oxygen or ozone stage $37,139 $76,240 n/a $12,561
288,101
kWh
- $15,435 $9,143
-
Tgal
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,188 $32,362 n/a $14,188
325,412
kWh
- - -
10 2.1243: Use heat from boiler blowdown to preheat boiler feed water $9,120 $16,200 n/a - $9,120
-
MMBtu
- -
11 2.1233: Analyze flue gas for proper air/fuel ratio $18,496 $100,000 n/a - $18,496
-
MMBtu
- -
TOTAL RECOMMENDED $160,924 $312,735 $107,065
2,455,633
kWh
$29,281
-
MMBtu
$15,435 $9,143
-
Tgal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs