1,079
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Commercial bakeries | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| KS2201 #08 Y:2022 | 08 | 2022 | Use solar heat to make electricty | $60,974 | $540,200 | |
| KS2201 #07 Y:2022 | 07 | 2022 | Use adjustable frequency drive or multiple speed motors on existing system | $15,572 | $61,880 | |
| KS2201 #06 Y:2022 | 06 | 2022 | Insulate bare equipment | $868 | $1,047 | |
| KS2201 #05 Y:2022 | 05 | 2022 | Use waste heat from flue gases to heat space conditioning air | $7,820 | $2,174 | |
| KS2201 #04 Y:2022 | 04 | 2022 | Use / purchase optimum sized compressor | $39,082 | $154,800 | |
| KS2201 #03 Y:2022 | 03 | 2022 | Level zero – install control systems for existing equipment | $1,085 | $4,460 | |
| KS2201 #02 Y:2022 | 02 | 2022 | Reduce the pressure of compressed air to the minimum required | $5,137 | $60 | |
| KS2201 #01 Y:2022 | 01 | 2022 | Eliminate leaks in inert gas and compressed air lines/ valves | $11,955 | $5,480 | |
| LS2212 #06 Y:2022 | 06 | 2022 | Use waste heat from hot flue gases to preheat | $19,481 | $28,000 | |
| LS2212 #05 Y:2022 | 05 | 2022 | Utilize higher efficiency lamps and/or ballasts | $389 | $468 | |
| LS2212 #04 Y:2022 | 04 | 2022 | Use adjustable frequency drive or multiple speed motors on existing system | $1,453 | $600 | |
| LS2212 #03 Y:2022 | 03 | 2022 | Utilize energy-efficient belts and other improved mechanisms | $545 | $150 | |
| LS2212 #02 Y:2022 | 02 | 2022 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,007 | $360 | |
| LS2212 #01 Y:2022 | 01 | 2022 | Make a practice of turning off lights when not needed | $572 | - | |
| UF0574 #15 Y:2021 | 15 | 2021 | Eliminate leaks in water lines and valves | $1,082 | $88 | |
| UF0574 #14 Y:2021 | 14 | 2021 | Minimize contamination of water before treatment | $18,108 | $45,538 | |
| UF0574 #13 Y:2021 | 13 | 2021 | Add/modify equipment to improve drying process | $16,503 | $80,000 | |
| UF0574 #12 Y:2021 | 12 | 2021 | Level zero – install control systems for existing equipment | $22,157 | - | |
| UF0574 #11 Y:2021 | 11 | 2021 | Level one – add communication using iiot devices to existing control system to modify operations | $287,926 | - | |
| UF0574 #10 Y:2021 | 10 | 2021 | Install vinyl strip / high speed / air curtain doors | $1,498 | $7,375 |