Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,079

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Commercial bakeries
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
KS2201 #08 Y:2022 Use solar heat to make electricty $60,974 $540,200
KS2201 #07 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $15,572 $61,880
KS2201 #06 Y:2022 Insulate bare equipment $868 $1,047
KS2201 #05 Y:2022 Use waste heat from flue gases to heat space conditioning air $7,820 $2,174
KS2201 #04 Y:2022 Use / purchase optimum sized compressor $39,082 $154,800
KS2201 #03 Y:2022 Level zero – install control systems for existing equipment $1,085 $4,460
KS2201 #02 Y:2022 Reduce the pressure of compressed air to the minimum required $5,137 $60
KS2201 #01 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $11,955 $5,480
LS2212 #06 Y:2022 Use waste heat from hot flue gases to preheat $19,481 $28,000
LS2212 #05 Y:2022 Utilize higher efficiency lamps and/or ballasts $389 $468
LS2212 #04 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $1,453 $600
LS2212 #03 Y:2022 Utilize energy-efficient belts and other improved mechanisms $545 $150
LS2212 #02 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $2,007 $360
LS2212 #01 Y:2022 Make a practice of turning off lights when not needed $572 -
UF0574 #15 Y:2021 Eliminate leaks in water lines and valves $1,082 $88
UF0574 #14 Y:2021 Minimize contamination of water before treatment $18,108 $45,538
UF0574 #13 Y:2021 Add/modify equipment to improve drying process $16,503 $80,000
UF0574 #12 Y:2021 Level zero – install control systems for existing equipment $22,157 -
UF0574 #11 Y:2021 Level one – add communication using iiot devices to existing control system to modify operations $287,926 -
UF0574 #10 Y:2021 Install vinyl strip / high speed / air curtain doors $1,498 $7,375