Assessment Year | 2022 |
---|---|
Principal Product | Fresh Bread and Buns |
NAICS | 311812: Commercial Bakeries |
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $100 M to 500M |
# of Employees | 243 |
Plant Area |
236,000
ft2
|
Annual Production | 150,000,000
lb
|
Production Hrs. Annual | 4,200
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,020,584 | 16,522,044 |
kWh
|
$0.062 | |
Natural Gas | $474,313 | 99,618 |
MMBtu
|
$4.76 | |
Waste Disposal Costs | |||||
Water Usage | $66,607 | 25,562 |
Tgal
|
$2.61 | |
TOTAL YEARLY COSTS | $1,561,504 | ||||
RECOMMENDED SAVINGS* | $155,657 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $84,910 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,955 | $5,480 |
$11,955
195,976
kWh
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,137 | $60 |
$5,137
84,210
kWh
|
- | - | |
03 | 4.661: Level zero – install control systems for existing equipment | $1,085 | $4,460 |
$1,085
17,791
kWh
|
- | - | |
04 | 2.4226: Use / purchase optimum sized compressor | $39,082 | $154,800 |
$39,082
640,689
kWh
|
- | - | |
05 | 2.2426: Use waste heat from flue gases to heat space conditioning air | $7,820 | $2,174 | - | - |
$7,820
-
MMBtu
|
|
06 | 2.2511: Insulate bare equipment | $868 | $1,047 | - | - |
$868
-
MMBtu
|
|
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $15,572 | $61,880 |
$15,572
255,281
kWh
|
- | - | |
08 | 2.9114: Use solar heat to make electricty | $60,974 | $540,200 |
$60,974
885,794
kWh
|
- | - | |
09 | 2.8118: Check for accuracy of utility / power meters | $13,164 | $120 | - | $13,164 | - | |
TOTAL RECOMMENDED | $155,657 | $770,221 |
$133,805
2,079,741
kWh
|
$13,164 |
$8,688
-
MMBtu
|
||
TOTAL IMPLEMENTED | $84,910 | $222,340 |
$71,746
1,176,156
kWh
|
$13,164 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs