| ARC | 2+ Digits Required | |
| NAICS | Commercial bakeries | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| TT0345 #09 Y:2025 | 09 | 2025 | Upgrade controls on compressors | $13,516 | $10,000 |
n/a
|
| TT0345 #08 Y:2025 | 08 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $14,442 | $3,250 |
n/a
|
| TT0345 #07 Y:2025 | 07 | 2025 | Recover waste heat from equipment | $9,214 | $15,000 |
n/a
|
| TT0345 #06 Y:2025 | 06 | 2025 | Change rate schedules or other changes in utility service | $35,814 | - |
n/a
|
| TT0345 #05 Y:2025 | 05 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $8,421 | $2,000 |
n/a
|
| TT0345 #04 Y:2025 | 04 | 2025 | Install occupancy sensors | $1,024 | $690 |
n/a
|
| TT0345 #03 Y:2025 | 03 | 2025 | Analyze flue gas for proper air/fuel ratio | $6,868 | $1,400 |
n/a
|
| TT0345 #02 Y:2025 | 02 | 2025 | Reduce the pressure of compressed air to the minimum required | $4,717 | $60 |
n/a
|
| TT0345 #01 Y:2025 | 01 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $12,654 | $8,950 |
n/a
|
| UF0636 #12 Y:2025 | 12 | 2025 | Meter recycled water (to reduce sewer charges) | $71,586 | $4,000 |
n/a
|
| UF0636 #11 Y:2025 | 11 | 2025 | Replace existing equipment with more suitable substitutes | $29,400 | $2,792 |
n/a
|
| UF0636 #10 Y:2025 | 10 | 2025 | Level zero – install control systems for existing equipment | $45,922 | $60,000 |
n/a
|
| UF0636 #09 Y:2025 | 09 | 2025 | Utilize energy-efficient belts and other improved mechanisms | $2,852 | - |
n/a
|
| UF0636 #08 Y:2025 | 08 | 2025 | Improve combustion control capability | $4,064 | $2,800 |
n/a
|
| UF0636 #07 Y:2025 | 07 | 2025 | Install turbulators | $4,892 | $7,500 |
n/a
|
| UF0636 #06 Y:2025 | 06 | 2025 | Reduce the pressure of compressed air to the minimum required | $7,364 | - |
n/a
|
| UF0636 #05 Y:2025 | 05 | 2025 | Utilize controls to operate equipment only when needed | $7,674 | $25,280 |
n/a
|
| UF0636 #04 Y:2025 | 04 | 2025 | Utilize higher efficiency lamps and/or ballasts | $14,820 | $29,969 |
n/a
|
| UF0636 #03 Y:2025 | 03 | 2025 | Use most efficient type of electric motors | $37,528 | $29,400 |
n/a
|
| UF0636 #02 Y:2025 | 02 | 2025 | Use demand controller or load shedder | $46,721 | $47,512 |