Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,074

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Commercial bakeries
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0345 #09 Y:2025 Upgrade controls on compressors $13,516 $10,000
TT0345 #08 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $14,442 $3,250
TT0345 #07 Y:2025 Recover waste heat from equipment $9,214 $15,000
TT0345 #06 Y:2025 Change rate schedules or other changes in utility service $35,814 -
TT0345 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $8,421 $2,000
TT0345 #04 Y:2025 Install occupancy sensors $1,024 $690
TT0345 #03 Y:2025 Analyze flue gas for proper air/fuel ratio $6,868 $1,400
TT0345 #02 Y:2025 Reduce the pressure of compressed air to the minimum required $4,717 $60
TT0345 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $12,654 $8,950
UF0636 #12 Y:2025 Meter recycled water (to reduce sewer charges) $71,586 $4,000
UF0636 #11 Y:2025 Replace existing equipment with more suitable substitutes $29,400 $2,792
UF0636 #10 Y:2025 Level zero – install control systems for existing equipment $45,922 $60,000
UF0636 #09 Y:2025 Utilize energy-efficient belts and other improved mechanisms $2,852 -
UF0636 #08 Y:2025 Improve combustion control capability $4,064 $2,800
UF0636 #07 Y:2025 Install turbulators $4,892 $7,500
UF0636 #06 Y:2025 Reduce the pressure of compressed air to the minimum required $7,364 -
UF0636 #05 Y:2025 Utilize controls to operate equipment only when needed $7,674 $25,280
UF0636 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $14,820 $29,969
UF0636 #03 Y:2025 Use most efficient type of electric motors $37,528 $29,400
UF0636 #02 Y:2025 Use demand controller or load shedder $46,721 $47,512