Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

53

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Bread and bakery product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BD0493 #08 Y:2016 Install compressor air intakes in coolest locations $188 $500
BD0493 #07 Y:2016 Install occupancy sensors $925 $1,050
BD0493 #06 Y:2016 Reduce the pressure of compressed air to the minimum required $932 $20
BD0493 #05 Y:2016 Recharge batteries on during off-peak demand periods $2,280 $50
BD0493 #04 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $2,605 $600
BD0493 #03 Y:2016 Analyze flue gas for proper air/fuel ratio $3,620 $6,000
BD0493 #02 Y:2016 Replace boiler $7,259 $14,000
BD0493 #01 Y:2016 Use radiant heater for spot heating $17,520 $1,900
BD0396 #07 Y:2011 Install compressor air intakes in coolest locations $4,851 $600
BD0396 #06 Y:2011 Install occupancy sensors $3,890 $4,200
BD0396 #05 Y:2011 Re-size charging openings or add movable cover or door $6,576 $300
BD0396 #04 Y:2011 Use most efficient type of electric motors $10,736 $20,080
BD0396 #03 Y:2011 Use waste heat from hot flue gases to preheat $18,092 $30,000
BD0396 #02 Y:2011 Replace obsolete burners with more efficient ones $26,133 $39,000
BD0396 #01 Y:2011 Use adjustable frequency drive or multiple speed motors on existing system $72,574 $19,000
BD0239 #17 Y:2003 Modify process to reduce material use/cost $2,000 $500
BD0239 #16 Y:2003 Pay bills on time to avoid late fees $1,048 -
BD0239 #15 Y:2003 Change operating conditions $63,779 $10,000
BD0239 #14 Y:2003 Lease / purchase baler; sell cardboard to recycler $3,140 $1,000
BD0239 #13 Y:2003 Utilize higher efficiency lamps and/or ballasts $311 $318