Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Poultry processing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK0884 #14 Y:2014 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $296,879 $1,365,235
OK0884 #13 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $28,973 $22,493
OK0884 #12 Y:2014 Install / repair insulation on steam lines $3,196 $349
OK0884 #11 Y:2014 Use waste heat from hot flue gases to preheat $9,402 $32,400
OK0884 #10 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $17,109 $30,860
OK0884 #09 Y:2014 Insulate bare equipment $451 $189
OK0884 #08 Y:2014 Clean and maintain refrigerant condensers and towers $1,563 $280
OK0884 #07 Y:2014 Install outside air damper / economizer on hvac unit $7,321 $5,500
OK0884 #06 Y:2014 Utilize higher efficiency lamps and/or ballasts $14,514 $25,520
OK0884 #05 Y:2014 Utilize higher efficiency lamps and/or ballasts $1,334 $6,440
OK0884 #04 Y:2014 Utilize higher efficiency lamps and/or ballasts $870 $4,275
OK0884 #03 Y:2014 Utilize higher efficiency lamps and/or ballasts $1,165 $5,440
OK0884 #02 Y:2014 Recover waste heat from equipment $1,067 $847
OK0884 #01 Y:2014 Install compressor air intakes in coolest locations $688 $875
OK0789 #11 Y:2010 Recharge batteries on during off-peak demand periods $997 $1,486
OK0789 #10 Y:2010 Use power during off-peak periods $34,743 $99,978
OK0789 #09 Y:2010 Insulate bare equipment $10,734 $5,136
OK0789 #08 Y:2010 Install / repair insulation on steam lines $827 $896
OK0789 #07 Y:2010 Use adjustable frequency drive or multiple speed motors on existing system $23,330 $17,280
OK0789 #06 Y:2010 Use adjustable frequency drive or multiple speed motors on existing system $7,798 $7,980