ITAC Assessment: OK0884
ITAC logo
ITAC Assessment: OK0884
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Processed Meat and Poultry
NAICS 311615: Poultry Processing
SIC 2015: Poultry Slaughtering and Processing
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 180,000
ft2
Annual Production 70,000,000
lb
Production Hrs. Annual 4,940
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,314,512 20,433,600
kWh
Electricity Demand $281,928 39,352
kW-mo/yr
Natural Gas $220,288 52,442
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $384,532 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,598

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $688 $875 $688
10,701
kWh
- - -
02 2.2437: Recover waste heat from equipment $1,067 $847 - - - $1,067
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,165 $5,440 $1,165
18,122
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $870 $4,275 $870
13,530
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,334 $6,440 $1,334
20,746
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $14,514 $25,520 $14,514
195,786
kWh
- - -
07 2.7241: Install outside air damper / economizer on hvac unit $7,321 $5,500 $7,321
113,724
kWh
- - -
08 2.7211: Clean and maintain refrigerant condensers and towers $1,563 $280 $1,176
18,288
kWh
$387
-
kW-mo/yr
- -
09 2.2511: Insulate bare equipment $451 $189 - - - $451
-
MMBtu
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,109 $30,860 $17,109
266,076
kWh
- - -
11 2.2414: Use waste heat from hot flue gases to preheat $9,402 $32,400 - - - $9,402
-
MMBtu
12 2.2136: Install / repair insulation on steam lines $3,196 $349 - - - $3,196
-
MMBtu
13 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $28,973 $22,493 $28,973
450,592
kWh
- - -
14 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $296,879 $1,365,235 - - $296,879 -
TOTAL RECOMMENDED $384,532 $1,500,703 $73,150
1,107,565
kWh
$387
-
kW-mo/yr
$296,879 $14,116
-
MMBtu
TOTAL IMPLEMENTED $3,598 $9,995 $3,211
49,940
kWh
$387
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs